My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1330 ROCKEFELLER AVE PEMC 3RD FLOOR 2021-08-30
>
Address Records
>
ROCKEFELLER AVE
>
1330
>
PEMC 3RD FLOOR
>
1330 ROCKEFELLER AVE PEMC 3RD FLOOR 2021-08-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:54:46 PM
Creation date
8/27/2021 2:42:18 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
1330
Tenant Name
PEMC 3RD FLOOR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/11/2021 Page 1 <br /> City of Everett <br /> 1:11:23PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1605-003 Site Address 1330 ROCKEFELLER AVE 3RD FLR <br /> Applied 5/18/2016 Applicant Lot <br /> Approved 6/3/2016 Owner PROVIDENCE HEALTH&SERVICES- Block <br /> Issued 6/6/2016 Contractor MACDONALD MILLER Tract <br /> Parent Permit No. B1603-024 Description PLMB/MECH FOR TI-PROVIDENCE MEDICAL GROUP <br /> Notes MECH INCLUDES(1)NEW VAV,(1)BOOSTER FAN,(1)TRANSFER FAN,(3)SMOKE DAMPERS, <br /> (118)NEW GRD'S,RELOCATE VAV BOXEX,MISC DUCTWORK.OTHER PLMG=EYEWASH, <br /> REFER BOXES <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 6/16/2016 6/16/2016 PlbgRoughln SDP PartialApproval See notes 1)Water rough in walls and overhead, <br /> except hot water tanks,Phase 1,OK. <br /> 2)Waste/vents to column Line 5,north <br /> side OK to cover. <br /> 6/16/2016 6/16/2016 MechRoughIn SDP PartialApproval See notes 1)OK to insulate. <br /> 2)OK to cover hard lids. <br /> 6/21/-2016 6/21/2016 PlbgRoughln SDP PartialApproval Rough in Phase I <br /> complete <br /> 6/27/2016 6/27/2016 PlbgRoughln SDP Approval Restrooms across the <br /> hall <br /> 7/14/2016 7/14/2016 Final Mech SDP PartialApproval Mech/Plbg Phase 1, Mechanical and Plumbing partial final for <br /> see notes Phase I. <br /> OK to drop tile. <br /> Re-call Plumbing for fixtures. <br /> 8/16/2016 8/16/2016 Final Plbg DXW Corr Reqd See notes Hot water tank in janitor room 310-55--fix <br /> leak at tank. <br /> Remove S-traps at sinks. <br /> Relief line cannot be direct connection to <br /> sewer,use funnel and trap primer. <br /> Complete wraps on sinks,complete grab <br /> bars in bathroom off hall. <br /> 8/18/2016 8/18/2016 Final Plbg SDP Approval <br /> 8/18/2016 8/18/2016 Final Mech SDP Approval <br /> 10/5/2016 10/5/2016 PlbgRoughln SDP PartialApproval See notes Plumbing rough-partial approval <br /> Walls-OK to cover-Recall for overhead <br /> and below floor(OK to take pictures of <br /> below floor tie-ins) <br /> 10/5/2016 10/5/2016 MechRoughIn SDP Approval See notes Mechanical rough-OK <br /> Note:call for mechanical final after <br /> flex/diffusers are set and before dropping <br /> ceiling tile <br /> 10/14/2016 10/14/2016 PlbgRoughln DXW PartialApproval Phase 2,see notes Phase 2-rough in Plumbing OK above <br /> • grid,pictures on rough in OK. <br /> Waste vents,water OK. <br /> 11/3/2016 11/3/2016 MechRoughIn BSM Approval See notes The ductwork above the ceiling looks OK <br /> for Phase II. <br /> 11/9/2016 11/9/2016 Mark Final** SDP Approval <br /> 11/9/2016 11/9/2016 Final Mech SDP Approval <br /> INSP12 CRWS YS T1 M <br />
The URL can be used to link to this page
Your browser does not support the video tag.