Laserfiche WebLink
5/11/2021 Page 1 <br /> City of Everett <br /> 1:11:23PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1605-003 Site Address 1330 ROCKEFELLER AVE 3RD FLR <br /> Applied 5/18/2016 Applicant Lot <br /> Approved 6/3/2016 Owner PROVIDENCE HEALTH&SERVICES- Block <br /> Issued 6/6/2016 Contractor MACDONALD MILLER Tract <br /> Parent Permit No. B1603-024 Description PLMB/MECH FOR TI-PROVIDENCE MEDICAL GROUP <br /> Notes MECH INCLUDES(1)NEW VAV,(1)BOOSTER FAN,(1)TRANSFER FAN,(3)SMOKE DAMPERS, <br /> (118)NEW GRD'S,RELOCATE VAV BOXEX,MISC DUCTWORK.OTHER PLMG=EYEWASH, <br /> REFER BOXES <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 6/16/2016 6/16/2016 PlbgRoughln SDP PartialApproval See notes 1)Water rough in walls and overhead, <br /> except hot water tanks,Phase 1,OK. <br /> 2)Waste/vents to column Line 5,north <br /> side OK to cover. <br /> 6/16/2016 6/16/2016 MechRoughIn SDP PartialApproval See notes 1)OK to insulate. <br /> 2)OK to cover hard lids. <br /> 6/21/-2016 6/21/2016 PlbgRoughln SDP PartialApproval Rough in Phase I <br /> complete <br /> 6/27/2016 6/27/2016 PlbgRoughln SDP Approval Restrooms across the <br /> hall <br /> 7/14/2016 7/14/2016 Final Mech SDP PartialApproval Mech/Plbg Phase 1, Mechanical and Plumbing partial final for <br /> see notes Phase I. <br /> OK to drop tile. <br /> Re-call Plumbing for fixtures. <br /> 8/16/2016 8/16/2016 Final Plbg DXW Corr Reqd See notes Hot water tank in janitor room 310-55--fix <br /> leak at tank. <br /> Remove S-traps at sinks. <br /> Relief line cannot be direct connection to <br /> sewer,use funnel and trap primer. <br /> Complete wraps on sinks,complete grab <br /> bars in bathroom off hall. <br /> 8/18/2016 8/18/2016 Final Plbg SDP Approval <br /> 8/18/2016 8/18/2016 Final Mech SDP Approval <br /> 10/5/2016 10/5/2016 PlbgRoughln SDP PartialApproval See notes Plumbing rough-partial approval <br /> Walls-OK to cover-Recall for overhead <br /> and below floor(OK to take pictures of <br /> below floor tie-ins) <br /> 10/5/2016 10/5/2016 MechRoughIn SDP Approval See notes Mechanical rough-OK <br /> Note:call for mechanical final after <br /> flex/diffusers are set and before dropping <br /> ceiling tile <br /> 10/14/2016 10/14/2016 PlbgRoughln DXW PartialApproval Phase 2,see notes Phase 2-rough in Plumbing OK above <br /> • grid,pictures on rough in OK. <br /> Waste vents,water OK. <br /> 11/3/2016 11/3/2016 MechRoughIn BSM Approval See notes The ductwork above the ceiling looks OK <br /> for Phase II. <br /> 11/9/2016 11/9/2016 Mark Final** SDP Approval <br /> 11/9/2016 11/9/2016 Final Mech SDP Approval <br /> INSP12 CRWS YS T1 M <br />