My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1918 ROCKEFELLER AVE 2021-08-27
>
Address Records
>
ROCKEFELLER AVE
>
1918
>
1918 ROCKEFELLER AVE 2021-08-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 3:02:17 PM
Creation date
8/27/2021 3:02:04 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
1918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5FA Design Group, LLC <br /> STRUCTURAL I CIVIL I GEOTECHNICAL I LAND USE PLANNING <br /> 4 <br /> eUZU SW Washington Square Drive,Suite 505,Portland,Oregon 97223 <br /> 5fca 1813 Rutan Drive,Suite C,Livermore,California 94551 <br /> 1912 S 146th Street,Seattle,Washington 98168 <br /> p:503-641-8311 www.sfadg.com <br /> Special Inspection <br /> FINAL SUMMARY REPORT <br /> December 16,2020 <br /> City of Everett,WA <br /> Construction Permit <br /> 3200 Cedar St,Everett,WA 98201 <br /> ATTN: Special Inspections <br /> RE: Project Name: Stratton Residence Underpinning <br /> Project No.: MFR20-071 <br /> Permit: B2009-043 <br /> Address: 1918 Rockefeller Ave,Everett,WA 98201 <br /> Dear Building Inspection Division: <br /> This letter serves to certify that in accordance with Chapter 17 of the International Building Code requirements <br /> outlined in the General Structural Notes on S 1.1 of the approved permit drawings, SFA Design Group,LLC has <br /> performed special inspection as detailed below. <br /> The inspector observed the installation of(14)FSI PP288 push piers,verifying pier locations,installation depth, <br /> installation pressure,bracket type,pier type,pier diameter and thickness. To confirm pier capacity,load tests <br /> were observed following installation and the results were within approved allowances. Please see attached field <br /> installation logs and load test data dated, 12/14/2020 & 12/16/2020. All anchors were installed per the intent of <br /> the design and any installation deviations were reviewed and approved by this office with no outstanding non- <br /> compliance items. <br /> Our inspection and testing services do not constitute a warranty or guarantee of any type and were provided and <br /> intended to help reduce the risk of construction defects,deficiencies or omissions that may arise during and after <br /> construction.It is the contractor's responsibility to perform their work in accordance with the approved <br /> construction documents. All inspections and tests were performed and reported according to the requirements of <br /> the City Building Regulations and these Administrative Rules and,to the best of my knowledge,the work was in <br /> conformance with the applicable workmanship provisions of the State Building Code and Standards. <br /> Sincerely, ,i([? <br /> 61.' 'A5 j y <br /> Mohamed El Katrani,EIT .. t ,,_/P <br /> SFA Design Group,LLC r; ::- <br /> 0,4 �p,10S 4 1S) <br /> Cc: Olga Ticot,Matvey Foundation Repair sNaL ' <br /> Reviewed by: Jeff Fitch,PE,P.Eng, SFA Design Group,LLC EXPIRES:I RES: 12/24/20 <br /> \ \ ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.