My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 RUCKER AVE SECOND LOOK CONSIGNMENT 2021-08-30
>
Address Records
>
RUCKER AVE
>
2930
>
SECOND LOOK CONSIGNMENT
>
2930 RUCKER AVE SECOND LOOK CONSIGNMENT 2021-08-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 10:12:02 AM
Creation date
8/30/2021 10:11:53 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2930
Tenant Name
SECOND LOOK CONSIGNMENT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P ;' OOSAL293 <br /> STANLEY ROOFING CO., INC. <br /> 19710 144th Avenue NE Page 2 of 2 <br /> W00DINVILLE, WA 98072 <br /> ST-AN-LR-3755T <br /> (425) 454-3929 (425) 483-6666 <br /> Fax (425) 483-6660 PHONE DATE <br /> TO: Gin Ridge Investment 425-252-3191 8/22/2019 <br /> JOB NAME!LOCATION <br /> Gin Ridge Invetment <br /> 2930 Rucker Avenue <br /> Everett, WA <br /> JOB NUMBER I JOB PHONE <br /> We hereby submit specifications and estimates for: <br /> SHEETMETAL <br /> *Install new 6" K style gutter on the west (alley) end of the building <br /> *Fabricate and install new 24 gauge sheet metal nosing at the gutter <br /> *Install continuous K style 6" gutter <br /> *Fabricate and install new 24 gauge open scupper and approximately 16" wide collector box <br /> *Install 6" round PVC downspout draining onto alley (painting by others) <br /> *Fabricate and install new 24 gauge factory pre.finished coping (continuous clip, standard colors only) <br /> TOTAL MATERIAL AND LABOR: $85,210.00 + Washington State Sales Tax <br /> EXCLUSIONS: All wood not listed above, deck replacement, asbestos or mold testing - abatement or removal, <br /> interior protection or damage, loss of business, sheetmetal not listed, custom sheetmetal colors, insulations <br /> bonds, City of Everett Building Permit (plan review if needed, Washington State Sales Tax <br /> • <br /> • <br /> • I <br /> We Propose hereby to furnish material and labor—complete in accordance with the above specifications,for the sum of: <br /> Eighty Five Thousand Two Hundred Ten and 00/100 Dollars dollars($ 85,210.00 <br /> Payment to be made as follows: <br /> MONTHLY PROGRESS, 100% UPON COMPLETION <br /> All material is guaranteed to be as specified.All work to be completed in a professional <br /> manner according to standard practices.Any alteration or deviation from above specifica- Authorized Lions involving extra costs will be executed only upon written orders, and will become an Signature <br /> extra charge over and above the estimate.All agreements contingent upon strikes,accidents <br /> or delays beyond our control.Owner to carry fire,tornado,and other necessary insurance. Note:This proposal may be 1 <br /> Our workers are fully covered by Worker's Compensation insurance. withdrawn by us if not accepted within 20 days. <br /> Acceptance of Proposal—The above prices. specifications and fIASignature r yIA A <br /> conditions are satisfactory and are hereby accepted. You are authorized to do the work Vf <br /> as specified.Payment will be made as outlined above. <br /> l.f 1 ) Qi Signature• <br /> Date of Acceptance: ( I ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.