Laserfiche WebLink
cv <br />cD <br />P <br />0 <br />04 <br />0) <br />41 <br />co <br />�I <br />>I <br />i2 <br />R <br />s <br />Lh <br />C) <br />00 <br />T <br />cu <br />Q <br />0 <br />I <br />w <br />z <br />LU <br />�a <br />�verera� 5tructurd Nate5 <br />CRITERIA@- <br />1, ALL MATERIALS WORKMAN5HIP DE516N AND CONSTRUCTION SHALL CONFORM TO THE DRAWIN65, 5PE6IFICATION5, AND THE <br />INTERNATIONAL BUILDIN6 CODE (IBC) WITH WA5HIN6TON 5TATE ADMIN15TRATIVE CODE AMFNDMENT5, 2015 EDITION. <br />2. DE516N LOADIN6 CRITERIA: <br />ROOF 5NOW LOAD . . . . . . . . 25 P5F ( I 9 = 1.0) <br />FLOOR LIVE LOAD (REG CENTER) . . . . . . . . 100 P5F <br />FLOOR LIVE LOAD (RESIDENTIAL UNITS) . . . . . . . 40 P5F <br />FLOOR LIVE LOAD (COMMON U5E/PUBLI6 BALCONIES AND 0E6K5) SAME A5 OCCUPANCY 5ERVED <br />FLOOR LIVE LOAD (PRIVATE BALCONIES AND DECKS) 60 P5F <br />FLOOR LIVE LOAD (RESIDENTIAL CORRIDORS) . . . , . . 40 P5F (100 P5F AT PUBLIC ROOMS AND CORRIDOR5) <br />5TA I R LIVE LOAD . . . . . . . . . . . . . . . . . . . . 100 P5F <br />6UARDRAIL5/BALCONY RAIL5 . . . . . . 50 PLF OR 200 LB CONCENTRATED LOAD <br />MECHANICAL UNITS . . . . . . . . . WE16HT5 FURNI5HEO BY MANUFACTURER <br />EARTHQUAKE (NEW BUILDIN6 DE5IGN) . . . . . . . . . . 5EI5M16 DE516N 6ATE60RY 0 <br />5 9 �1.26,59=0.46,5 p5 = 0.64,5 0.41 <br />L16HT FRAMED WOOD 5TUCTURAL SHEAR PANELS <br />R f 6.5, no � 2.5, 1E0 1.0 <br />DE516N STORY DRIFT p0.02 * H <br />WIND . . . . . . . . . . . . . . . . . . . . . . . . 110 MPH, EXP05URE 11611,1 W = 1.0, Kzt= 1.10 <br />WIND (CLAPDIN6/EN6LO5URE ELEMENT DE516N PRE55URE5) . . . . 50/16 P5F MAX. AT WALL5 (LRF0/A5D) <br />46/26 P5F 6RO55 UPLIFT AT ROOF (LRFD/A5D) <br />WIND PRE55URE5 BA5ED ON LE55 THAN 10 5QUARE FOOT TRIBUTARY AREA5 NEAR WALL CORNER5 OR ROOF E06E5 (EXGLUDIN6 <br />CORNER ZONES AT ROOF). REDUCED DE516N PRE55URE5 MAY BE CALCULATED IN ACCORDANCE WITH A56E 1-10 CHAPTER 30. <br />SEE PRAHIN65 FOR ADDITIONAL LOADIN6 CRITERIA <br />3. STRUCTURAL PRANIN65 SHALL BE USED IN CONJUNCTION WITH ARCHITECTURAL PRAHIN65 AND ALL OTHER CONTRACT 006UMENT5 <br />FOR BIDDING AND CON5TRU6TION. CONTRACTOR 5HALL VERIFY DIMEN5ION5 AND 6ONDITION5 FOR COMPATIBILITY AND 5HALL <br />NOTIFY ARCHITECT OF ALL D156REPANCIE5 PRIOR TO CONSTRUCTION, IT I5 THE CONTRACTOR'S RE5PON5151LITY TO COORDINATE <br />BUILDING LAYOUT DIMEN51ON5 (GRID LAYOUTS, 51TE COORDINATES, ETC.) AMON65T ALL TRADES; INGLUDIN6 SHOP FABRICATED <br />ITEMS. <br />4. CONTRACTOR SHALL PROVIDE TEMPORARY BRA6IN6, BOTH FOR VERTICAL LOAD5 AND LATERAL STABILITY, FOR THE STRUCTURE <br />AND STRUCTURAL 6OMPONENT5 UNTIL ALL FINAL 6ONNE6TION5 HAVE BEEN COMPLETED IN ACCORDANCE WITH THE DRAWIN65, <br />5. CONTRACTOR 5HALL BE RE5PON51BLE FOR ALL 5AFETY PRECAUTION5 AND THE METHOD5, TECHNIQUES, 5FQUENCE5 OR PROCEDURES <br />REQUIRED TO PERFORM THE WORK. <br />6. GONTRAGTOR-INITIATED 6HAN6E5 5HALL BE SUBMITTED IN WRITIN6 TO THE ARCHITECT AND STRUCTURAL EN61NEER FOR <br />APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. 6HAN6E5 5HOWN ON SHOP PRAHIN65 ONLY WILL NOT 5AT15FY TH15 <br />REQUIREMENT. <br />1. PRAHIN65 INDICATE OENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE 6ONDITION5 ARE NOT 5PECIFICALLY INDICATED <br />BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, 51MILAR DETAIL5 OF CONSTRUCTION 5HALL BE USED, SUBJECT TO REVIEW <br />AND APPROVAL BY THE ARCHITECT AND THE STRUCTURAL EN61NEER, <br />S. ALL STRUCTURAL SYSTEMS COMP05ED OF 00MPONENT5 TO BE FIELD ERECTED 5HALL BE 5UPERVI5ED BY THE SUPPLIER DURIN6 <br />MANUFA6TURIN6, DELIVERY, HANDLIN6, 5TORA6E AND ERECTION IN ACCORDANCE WITH IN5TRU6TION5 PREPARED BY THE SUPPLIER. <br />1. SEISMIC BRACIN6 AND/OR 6RAVITY SUPPORT AND AN6HORA6E OF ALL MECHANICAL OR ELECTRICAL EQUIPMENT SHALL BE <br />DE5I6NED BY A PROFE55IONAL EN6INEER RE615TERED IN THE STATE OF WA5HIN6TON, EXCEPT FOR ELEMENT5 5PECIF16ALLY 5HOWN <br />AND DETAILED ON THE STRUCTURAL DRAWIN65. THE MECHANICAL/ELECTRICAL CONTRACTOR MUST HIRE THE EN6INEER AND 15 <br />RESPONSIBLE FOR ALL G05T5 RELATED TO THE PURCHASE AND INSTALLATION OF NECE55ARY SUPPORTS, BRACING AND ANCHORA6E. <br />5EI5MI6 5RA61% AND ANCHORAGE DE516N AND CONSTRUCTION SHALL COMPLY WITH CHAPTER 13 OF A56E 1-10. SEE 6ENERAL <br />STRUCTURAL NOTE 13 FOR ADDITIONAL INFORMATION. <br />10. SHOP PRAHIN65 FOR RFINFOR61% STEEL (FOR BOTH CONCRETE AND MA50N Y CONSTRUCTION), STRUCTURAL. STEEL, 6LUED <br />LAMINATED MEMBERS, AND CONNECTOR PLATE WOOD ROOF TRU55E5 SHALL BE SUBMITTED TO THE ARCHITECT AND STRUCTURAL <br />EN6INEER FOR REVIEW PRIOR TO FABRICATION OF THESE ITEM5. <br />11. SHOP DRAWIN6 REVIEW: DIMEN51ON5 AND QUANTITIES ARE NOT REVIEWED BY THE EN61NEER OF RECORD, AND THEREFORE MUST <br />BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR SHALL REVIEW AND STAMP DRAWIN65 PRIOR TO REVIEW 5Y EN61NEER OF <br />RECORD. 5UBMITTAL5 SHALL INCLUDE A REPROPU61BLE AND ONE COPY. THE REPRODUCIBLE SHALL BE MARKED AND RETURNED. <br />SHOP DRAWIN6 5UBMITTAL5 PROCE55ED BY THE EN61NEER ARE NOT CHANGE ORDER5. THE PURP05E OF SHOP DRAWIN6 5UBMITTAL5 <br />BY THE CONTRACTOR 15 TO DEMONSTRATE TO THE EN61NEER THAT THE CONTRACTOR UNDER5TAND5 THE DE516N CONCEPT BY <br />INDI6ATIN6 WHICH MATERIAL 15 INTENDED TO BE FURNI5HEP AND IN5TALLED AND BY DETAILIN6 THE INTENDED FABRICATION AND <br />INSTALLATION METHODS. IF DEVIATIONS, DISCREPANCIES, OR 6ONFLI6T5 BETWEEN SHOP DRAWIN6 5UBMITTAL5 AND THE <br />CONTRACT DOGUMENT5 ARE P156OVERED EITHER PRIOR TO OR AFTER 5HOP 3RANIN6 5UBMITTAL5 ARE PROCE55ED 5Y THE EN6INEER <br />THE DE516N PRAHIN65 AND 5PE6IFICATION5 5HALL CONTROL AND SHALL BE FOLLOWED, <br />12. DEFERRED 5UBMITTAL5; SHALL BE DE516NED BY AN EN61NEER RE615TERED IN THE STATE OF HAW NFON. THE COMPONENT <br />DE516NER SHALL BE A RE6I5TERED 5TRUCTURAL EN61NEER IF REQUIRED BY THE BUILDIN6 OFFICIAL OF THE LOCAL <br />JURISDICTION. SUILDIN6 COMPONENT 5UBMITTAL5 SHALL INCLUDE THE DE516NIN6 PROFE55IONAL EN6INEER'5 STAMP, AND SHALL <br />BE APPROVED BY THE COMPONENT DE5I6NER PRIOR TO 6UR50RY REVIEW BY THE EN61NEER OF RECORD FOR LOADS IMP05ED ON THE <br />BASK STRUCTURE. THE COMPONENT PE516NER 15 RE5PON5IBLE FOR CURE CONFORMANCE IN6LUDIN6 ACCOMMODATION FOR <br />5TRUGTURAL 015PLACEMENT PER A56E 1-10 SECTION 13.5.2. AND ALL NE6E55ARY CONNECTIONS NOT 5PE6IFICALLY GALLED OUT <br />ON ARCHITECTURAL OR STRUCTURAL PRAHIN65. DEFERRED SUBMITTALS SHALL INDICATE MA6NITUDE AND DIRECTION OF ALL LOADS <br />IMPOSED ON BA516 STRUCTURE. DE516N 6AL6ULATION5 SHALL BE INCLUDED IN THE SUBMITTAL. THE CONTRACTOR SHALL <br />FORWARD DEFERRED 5UBMITTAL5 TO THE BUILDIN6 OFFICIAL WHERE REQUIRED. <br />THE FOLLUWIN6 BUILDIN6 6OMPONENT5 5HALL BE DEFERRED 5UBMITTAL5 FOR THI5 PROJECT: <br />PRECAST STAIR TREADS <br />SEISMIC HOLD -GOWN SYSTEM (SEE NOTE 56) <br />PREFABRICATED CONNECTOR PLATE WOOD ROOF TRU55E5 (5EE NOTE 32) <br />5TAlMMENT OF 5PECIAL I <br />15. 5TATEMENT OF 5PE61AL IN5PECTION5 - 5TRUCTURAL ITEM5 (SEISMIC PE5I6N 6ATE60RY D): <br />DEFINITION5: <br />THE SEISMIC FORCE RE515TIN6 SYSTEM FOR TH15 STRUCTURE 6ON5I5T5 PRIMARILY OF SHEAR WALL5, FLOOR/ROOF DIAPHRA6M5, <br />AND STRUT MEMBERS A5 SPECIFIED ON THE PRAHIN65. SEE THE LE6END OF PLAN SHEETS FOR ADDITIONAL INFORMATION <br />DEFININ6 MEMBER LOCATIONS. <br />SPECIAL IN5PE6TION5 AND TE5TIN6 SHALL BE PERFORMED BY THE OWNER APPOINTED INSPECTION A6EN6Y IN ACCORDANCE WITH <br />CHAPTER 11 OF THE IBC WITH REPORTS PER 166 SECTION 1104.2.4 SUBMITTED TO THE OWNER, ARCHITECT, 5TRU6TURAL <br />EN61NEER, CONTRACTOR, AND BUILDIN6 OFFICIAL FOR EACH DAY 5PE61AL IN5PE6TION5 OR TE5TIN6 IS PERFORMED, THE5E <br />IN5PECTION5 ARE IN ADDITION TO THE IN5PE6TION5 SPECIFIED IN 166 SECTION 110. 5FE TABLES BELOW FOR ADDITIONAL <br />INFORMATION. <br />STRUCTURAL ITEMS 5FE61AL INSPECTION FREQUENCY 166 REFERENCE <br />STRUCTURAL STEEL FABRICATION,ERECTION AND NONDE5TRUCTIVE TE5TIN6* <br />5PE61AL INSPECTION AND NONVE5TRUCTIVE TE5TIN6 FOR STRUCTURAL 5TEEL 5HALL BE IN A66ORDANGE WITH THE QUALITY <br />ASSURANCE (QA) INSPECTION REQUIREMENTS OF AI56 360-10 CHAPTER N. CONTINUOUS IN5PE6TION 5HALL BE PERFORMED AT "P" <br />TA5K5 DEFINED IN A15C 360-10; PERIODIC INSPECTION SHALL BE PERFORMED AT "0' TA5K5 DEFINED IN AI56 560-10. <br />CONCRETE (SEE 6ENERAL STRUCTURAL NOTE 1q FOR ADDITIONAL REQUIREMENTS* <br />REINFORCIN6 PLACEMENT PERIODIC AND PRIOR TO ALL CONCRETE POURS TABLE 1105.3 ITEM 1 <br />ANCHOR BOLT PLACEMENT PERIODIC AND PRIOR TO ALL 60NC TE POUR5 TABLE 1105.3 ITEM 3 <br />CONCRETE PLACEMENT"* 6ONTINUOU5 TABLE 1105.3 ITEM 5,641 <br />CURIN6 # FORMWORK PR06EDURE5 PERIODIC TABLE 1105.3 ITEM 6,11412 <br />WOOD <br />FA5TENER5, BOLTS, STRAPS, PERIODIC FOR 6ONNECTION5 OF ALL MEMBERS OF 1105.11.141105.12.2" " <br />HOLDOWN5, ETC. THE 5E15MI6 AND WIND FORGE RE515TIN6 SYSTEM <br />INGLUDIN6 OIAPHA6M5, SHEAR HALLS, <br />5TRUT5, 4 HOLPOWN5 <br />PREFABRICATED CONNECTOR REVIEW OF TEMPORARY AND PERMANENT 1105.5.2 <br />PLATE WOOD TRU55E5 INSTALLATION BRACIN6 FOR 5PAN5 > 6OFT <br />EXPAN51ON BOLTS 4 IN5ERT5 PERIODIC INGLUDIN6 TORQUE TE5T5 IN ACCORDANCE TABLE 1103.3 ITEM 4 <br />WITH APPROVED I66-E5 REPORTS <br />EPDXY 6ROUTED ROD5 OR REBAR PERIODIC IN6LUDIN6 INSPECTION OF EMBEDMENT TABLE 1105.5 ITEM 4, <br />DEPTH AND HOLE 6LEANLINE55 PRIOR TO ALL A61 31b-14 SECTION 11.6 <br />INSTALLATIONS <br />501L COMPACTION CONTINUOUS 1105.6 <br />EXCEPTIONS 1 THRU 5 PER IBC SECTION 110.3 SHALL NOT APPLY TO CONCRETE WORK ON THI5 PROJECT. <br />FREQUENCY OF CONCRETE LABORATORY TE5TIN6 5HALL BE IN ACCORDANCE WITH AGI 316-14 SECTION 26,12.2 UNLE55 <br />OTHERN15E NOTED IN THE PROJECT SPECIFICATIONS. <br />*#*' THE EXCEPTION FOR 5HEATHIN6 FASTENED AT A 5PACIN6 GREATER THAN 4"or, SHALL NOT APPLY TO WOOD OR METAL <br />FRAMIN6 ON TH15 PROJECT. <br />SEISMIC PE516N REQUIREMENTS PERIODIC SPECIAL INSPECTION <br />ARCH MECH 4 ELEC ITEM5 (ASCE 1-10 CHAPTER 13) AS 5PE61FIEP PER 166 CHAPTER 11 <br />SUSPENDED 6EILIN65 A56E 1-10 SECTION 13.5.6 INSPECTIONS PER IBC 5E6TION 110 AND <br />A56E 1 13.5.6.2.2 AS REQUIRED <br />PARTITION WALL5 A56E 1-10 SECTION 13.5.8 REQUIRED OURIN6 ERECTION AND FA5TENIN6 <br />FOR WALL5 > 15 P5F (IB( 1105.12.5) <br />ALL OTHER MECHANICAL AND A56E 1-10 SECTION 13.6 NOT REQUIRED <br />ELECTRICAL 6UMPONENT5 <br />5TRU6TURAL OBSERVATION IN A66ORPANCE WITH 156 SECTION 1104.6 WILL BE PERFORMED BY THE STRUCTURAL EN61NEER OF <br />RECORD OURIN6 CONSTRUCTION AT 5I6NIFIOANT CONSTRUCTION 5TA6E5 AND AT COMPLETION OF THE 5TRU6TURAL SYSTEM, <br />5TRU6TURAL 055ERVATION 6ON515T5 OF V15UAL 085ERVATION FOR 6ENERAL CONFORMANCE TO THE CON5TRU6TION DOCUMENT5 AND <br />DOE5 NOT INCLUDE OR WAIVE THE RESPONSIBILITY FOR THE IN5PE6TION5 REQUIRED BY 5E6TION5 110, 1104, OR OTHER <br />5EGTION5 OF THE 156. <br />CONTRACTOR STATEMENT OF RE5PON51BILITY: CONTRACTOR SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY IN <br />ACCORDANCE WITH 166 SECTION 1104,4 TO THE BUILDIN6 OFFICIAL AND OWNER PRIOR TO CONSTRUCTION A6KNOWLED61% THE <br />SPECIAL REQUIREMENTS CONTAINED IN THE 5TATEMENT OF SPECIAL IN5PE6TION5. <br />GEOTECHNICAL: <br />14. FOUNDATION NOTES: 506RADE PREPARATION INGLUDIN6 URAINA6E, EXCAVATION, COMPACTION, AND FILLIN6 REQUIREMENT5, <br />SHALL CONFORM 5TR16TLY WITH RE60MMENDATION5 61VEN IN THE 50IL5 REPORT OR A5 DIRECTED BY THE 6EOTECHNI6AL <br />EN61NEER. FOOTIN65 SHALL BEAR ON FIRM, COMPETENT NATIVE 501L, RE60MPACTED FILL OR NATIVE 501L, OR NEW 5TRU6TURAL <br />FILL AT LEAST 1b" BELOW LONE5T ADJACENT FINI5HED 6RAPE. BACKFILL BEHIND ALL RETAININ6 HALLS, WITH FREE DRAININ6, <br />6ANULAR FILL AND PROVIDE FOR SUBSURFACE DRA.AINA6E A5 NOTED IN THE 6EOTE6HNI6AL REPORT. <br />ALLOWABLE 50IL PRESSURE . . 2,500 P5F <br />LATERAL EARTH PRE55URE (RE5TPAINEO/UNRE5TRAINED). . .. . . . . . 35 PCF/ 50 PCF <br />50I L PROFILE TYRE . .. .. .. .. . . . . . . . . . . . 51 TE 6LA55 D <br />6EOTE6HNICAL REPORT REFERENCE: "EARTH 5OLUTION5 NH, PROP05ED RE5IDENTIAL APARTMENT COMPLEX, 1602-1626 EAST <br />MARINE VIEW DRIVE, EVERETT, WA5HIN6TON, PROJECT #E5-413b.05 A6U6U5T 1, 2011. <br />01 m 1 TRASH ENCL05UREIII& <br />FOUNDATION53.01 TYPICAL <br />53.02 FOUNDATION DETAILS <br />JOHNSJOHNSON BRAUNDINC. <br />15200 52nd Ave. South <br />Suite 300 <br />Seattle, WA 03183 <br />Phone 206.766,8300 <br />w wwr.johnsonbraund.com <br />ARCHITECTURE <br />INTERIOR DESIGN <br />Greg L. Allwine, AIA <br />Jeffrey A. Williams, AIA <br />Mgt I SECOND k I' <br />SEATTLE,98104 <br />P 206/343-0460 <br />A CONSULTING <br />STRUCTURAL ARID CIVIL <br />ENGINEERING CORPORATION <br />I <br />ISSUE ®ATE: Issue Date <br />PROJECT #: <br />DRAWN N BY: <br />CHECKED BY: <br />co <br />co <br />LO <br />® co <br />LO <br />L <br />g� <br />w® <br />cp <br />MU) <br />DZ�1 <br />S 182046-03 <br />JAT <br />CMp <br />