My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 SHUKSAN WAY 2021-09-01
>
Address Records
>
SHUKSAN WAY
>
215
>
215 SHUKSAN WAY 2021-09-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 8:42:45 AM
Creation date
9/1/2021 8:42:42 AM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/1/2021 City of Everett Page I <br /> 7:39:27AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. PW2008-009 Site Address 215 SHUKSAN WAY <br /> Applied 8/5/2020 Applicant Lot <br /> Approved 8/25/2020 Owner DPIF2 WA 7 MOUNTAIN VIEW LLC Block <br /> Issued 8/25/2020 Contractor TBD Tract <br /> Parent Permit No. Description EMERGENCY SITE STABILIZATION PERMIT <br /> Notes (8/5/2020 3:43 PM SFF) <br /> INSTALL AND MAINTAIN TEMPORARY EROSION AND SEDIMENTATION CONTROL <br /> MEASURES TO STABILIZE THE SITE IN THE INTERIM CONDITION BETWEEN THE CLOSURE <br /> OF THE CADMAN PIT AND THE CONSTRUCTION OF FUTURE DEVELOPMENT. <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 8/26/2020 8/26/2020 NPDES INITIAL PWI APPROVAL <br /> INSPECTION <br /> 8/26/2020 8/27/2020 PW 01-JOB START RDA APPROVAL eTRAKiT Inspection 8/25/2020 1:11 PM Bryce Mullen <br /> NOTIFICATION Request <br /> Contact Name:Bryce Mullen <br /> Site Address:215 SHUKSAN WAY <br /> Phone:4254669619 <br /> e-Mail:bmullen@foushee.com <br /> 12/16/2020 12/16/2020 NPDES MID PWI APPROVAL <br /> PROJECT <br /> 12/23/2020 12/23/2020 PW 03-EROSION RDA VIOLATION correction required (12/23/2020 2:41 PM RDA) <br /> CONTROL The emergency site stabilization has not <br /> been completed with the temp pond at the <br /> southeast corner of the site partially <br /> complete.The rain event that occurred on <br /> Monday the 21st overwhelmed the <br /> northeastern temp pond so the contractor <br /> pumped turbid water to city catch basin in <br /> Glenwood Ave,this was done so there <br /> wasn't a failure of the pond to the north that <br /> could have flooded the Columbia business. <br /> The contractor is continuing to work on the <br /> southeastern temp pond and has Baker <br /> tanks onsite to process turbid site storm <br /> water. <br /> 1/28/2021 1/28/2021 PW 22-OTHER RDA CORRECTION (1/28/2021 3:17 PM RDA) <br /> Contractor must pickup all loose plastic on <br /> pond slope next to Glenwood ave. <br /> 2/25/2021 2/25/2021 NPDES FINAL PWI APPROVAL <br /> INSPECTION <br /> 2/26/2021 2/26/2021 PW 25-SITE RDA APPRVD-PERK eTRAKiT Inspection 2/25/2021 2:30 PM Eric Crowley <br /> FINAL/PERMIT Request <br /> Contact Name:Eric Crowley <br /> Site Address:215 SHUKSAN WAY <br /> Phone:4259418125 <br /> e-Mail:ecrowley@foushee.com <br /> INSP12 CRWSY <br />
The URL can be used to link to this page
Your browser does not support the video tag.