My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3104 TULALIP AVE 2021-09-01
>
Address Records
>
TULALIP AVE
>
3104
>
3104 TULALIP AVE 2021-09-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 9:42:35 AM
Creation date
9/1/2021 9:41:29 AM
Metadata
Fields
Template:
Address Document
Street Name
TULALIP AVE
Street Number
3104
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/11/2020 „ City of Everett Page 1 12 <br /> 9:15;52A1�I <br /> ` INSPECTION ACTIVITY REPORT <br /> Permit No. M2002-042 Site Address 3104 TULALIP AVE <br /> Applied 2/13/2020 Applicant PILCHUCK HEATING LLC Lot <br /> Approved 2/21/2020 Owner BRADDOCK LAURA C&ADAM J Block <br /> Issued 2/21/2020 Contractor PILCHUCK HEATING LLC Tract <br /> Parent Permit No. B1907-012 Description Install 1 ductless heat pump,1 ducted indoor unit <br /> Notes **SUBJECT TO FIELD INSPECTION. OUTDOOR UNITS NOT TO BE INSTALLED IN ANY FROM <br /> OR SIDE YARD SETBACK** <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 3/10/2020 3/10/2020 MECH 04-ROUGH SDP APPROVAL As noted: 3/9/2020 8:22 AM PILCHUCK HEATING <br /> IN LLC <br /> Contact Name:PILCHUCK HEATING <br /> LLC <br /> Site Address:3104 TULALIP AVE <br /> Phone:4255850659 <br /> e-Mail: <br /> pilchuckheating@pilchuckheating.com <br /> (3/10/2020 1:58 PM SDP) <br /> Stove exhaust and bath exhaust can be <br /> looked at at final.There is an attic hatch in <br /> place. <br /> Note: <br /> 1)Exhaust ducts must be insulated to R-4 <br /> minimum. <br /> 2)Stove exhaust must be smooth metal <br /> duct,6"min.and insulated to R-4 <br /> 7/22/2020 7/22/2020 MECH 06-FINAL SDP OTHER (7/22/2020 5:29 AM SDP) <br /> Test <br /> (7/22/2020 5:43 AM SDP) <br /> Test <br /> 7/22/2020 7/22/2020 MECH 06-FINAL JHK CORRECTION (7/22/2020 5:25 AM sdp) <br /> Inspector SDP changed the inspection <br /> assignment from SDP to JHK <br /> (7/22/2020 3:29 PM JHK) <br /> stove and bath exaust pipe not installed. <br /> 9/2/2020 9/2/2020 MECH 06-FINAL SDP NO ACCESS locked up/no 9/1/2020 9:33 AM PILCHUCK HEATING <br /> answer at the door LLC <br /> Contact Name:PILCHUCK HEATING <br /> LLC <br /> Site Address:3104 TULALIP AVE <br /> Phone:4255015480 <br /> e-Mail: <br /> pilchuckheating@pilchuckheating.com <br /> 9/3/2020 9/3/2020 MECH 06-FINAL SDP CORRECTION eTRAKiT Inspection 9/2/2020 3:24 PM PILCHUCK HEATING <br /> Request LLC <br /> There is a lockbox.Please call <br /> 425-501-5480 Jeff for code <br /> Contact Name:PILCHUCK HEATING <br /> LLC <br /> Site Address:3104 TULALIP AVE <br /> Phone:4255850659 <br /> e-Mail: <br /> pilchuckheating@pilchuckheating.com <br /> (9/3/2020 3:18 PM SDP) <br /> Corragated duct is not allowed on a stove <br /> exhaust,see IRC section M1503. <br /> INSP12 CRW$YSTTZ:Ms' <br />
The URL can be used to link to this page
Your browser does not support the video tag.