Laserfiche WebLink
8/17/2021 City of Everett Page <br />9:13:12AM <br />INSPECTION ACTIVITY REPORT <br />Permit No. E2012-059 Site Address 1411 36TH ST <br />Applied 12/9/2020 Applicant AQUALINE PLBG ELEC & HTNG LLC Lot <br />Approved 12/10/2020 Owner MOBLEY KC/JOHNSON MICHAEL Block <br />Issued 12/23/2020 Contractor AQUALINE PLBG ELEC & HTNG LLC Tract <br />Parent Permit No. Description Panel uprade <br />Notes Upgrade meter and panel to 200amp <br />Scheduled COmDleted ' TVDe Inspector Result Remarks Inspector's Comments <br />12/29/2020 12/29/2020 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 12/26/2020 11:55 AM AQUALINE PLBG <br />Request ELEC & HTNG LLC <br />call owner for access <br />Contact Name: Jonathan Coe <br />Site Address: 1411 36TH ST <br />Phone:4253190714 <br />e-Mail: aqualinefamily@gmail.com <br />1/20/2021 1/20/2021 ELEC 09-FINAL SKB <br />2/2/2021 2/2/2021 ELEC 09-FINAL SKB <br />NO ACCESS eTRAKiT Inspection <br />Request <br />CORRECTION eTRAKiT Inspection <br />Request <br />(12/29/2020 3:32 PM SKB) <br />Drive ground rods flush to the earth. Run a <br />number four copper continuous from the <br />grounded bus to the main water line within <br />5 feet of where it enters the building. Close <br />all unused openings in the panel. NM cable <br />sheathing must extend all the way into the <br />panel. Multi wire branch circuit shall have <br />handled ties disconnecting all ungrounded <br />conductors simultaneously. Provide access <br />into the meter section for visual inspection. <br />1/15/2021 2:59 PM AQUALINE PLBG <br />ELEC & HTNG LLC <br />corrections <br />Contact Name: Jonathan Coe <br />Site Address: 1411 36TH ST <br />Phone:4253190714 <br />e-Mail: aqualinefamily@gmail.com <br />2/l/2021 3:31 PM AQUALINE PLBG <br />ELEC & HTNG LLC <br />Contact Name: AQUALINE PLBG ELEC <br />& HTNG LLC <br />Site Address: 1411 36TH ST <br />Phone:4253190714 <br />e-Mail: Aqualinefamily@gmail.com <br />(2/2/2021 4:09 PM SKB) <br />Water must be bonded within 5' where it <br />enters the building. Multi wire branch <br />circuits must have handled ties the trip both <br />phases simultaneously. Provide access to <br />meter. <br />INSPI2 CAWS STEM,, S <br />