Laserfiche WebLink
Intake • • to a &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT #� <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />Garage/Accessory Struct. Size <br />Number of Stories <br />Basement <br />❑No ❑Yes , Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Fire Sprinklers: ❑Update Existing El New System ❑Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑Update Existing El New System ❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? []Yes ❑ No <br />Add'I RCW 64.55 docs required prior to final? ❑Yes ❑No <br />VALUATION CALCULATION: Total $ <br />Additional Notes: Isar Rrx:(A)iRe? REF-IM, cam• <br />WV r:�D�T o�1au. MOVMI J�, L QDHr11a <br />? rz(D roD ,� J I II <br />Approved By: Date: <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />[]Fire Sprinklers []Fire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />❑ Review / Inspection Scope - ADD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: Date: <br />Intake Comments: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />❑ OK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Re fired before Final? []Yes ONo <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total <br />Calculated: Credit: <br />[]Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: <br />Approved B Date: �'Z <br />PUBLIC WORKS <br />Intake OK by: .Date: <br />............................................................................................................................................................. <br />Intake Comments: PW Worksheet Needed if.• <br />[]Sys Dev Eval ❑Traffic Mit Eval <br />❑Site Work or Drainage Proposed <br />❑Backflow Prevention for high hazard: <br />i(dental, medical, animals, mortuary, hospital, <br />;supportive housing) <br />:.. ................ <br />❑ Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AN ❑Create Green Folder [Submitted Previously ❑Deferred <br />This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (ioin with this folder for permit issuance) <br />❑ WIII be Issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />❑ Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved By: AAA <br />Date: <br />