My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
829 56TH PL SW 2021-12-20
>
Address Records
>
56TH PL SW
>
829
>
829 56TH PL SW 2021-12-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 11:43:45 AM
Creation date
9/15/2021 2:00:19 PM
Metadata
Fields
Template:
Address Document
Street Name
56TH PL SW
Street Number
829
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/11/2021 <br />8:47:28AM <br />City of Everett <br />INSPECTION ACTIVITY REPORT <br />11/13/2019 <br />11/14/2019 <br />2/11/2020 <br />11/13/2019 <br />11/14/2019 <br />2/11/2020 <br />BLDG <br />06-UNDERSLAB <br />MECH <br />02-GROUND <br />BLDG <br />08-FRAMING <br />KMK <br />SDP <br />DWF <br />CORRECTION do not pour. see note <br />11/12/2019 11:48 AM Alex shutov <br />Under slab insulation installed along with <br />radiant heating system. Seeking for an <br />inspection and hopefully an approval to <br />pour 4" slab over insulation and radiant <br />heat water tubes. <br />Please stop by sometime between 9 am -10 <br />Am, ill be there waiting for this walk <br />through. <br />NOTE: <br />This is an ADU unit located in basement, <br />the entrance is on the right side through the <br />swing gate. <br />Contact Name: Alex shutov <br />Site Address: 829 56TH PL SW <br />Phone:4253873873 <br />e-Mail: andrew@progranite.com <br />(11/13/2019 3:30 PM KMK) <br />Call for mechanical inspection for radiant <br />heat in slab before pouring concrete. <br />APPROVAL ok to pour 11/13/2019 8:18 PM Alex shutov <br />Hello, <br />I am requesting a mechanical inspection for <br />radiant heat in slab before pouring concrete. <br />I am going to be on job site between 8 am <br />-9 am , please try your best to stop by with <br />in that window. Slab pour has been <br />scheduled for 1 pm same day. Hopefully we <br />can stick to the calendar. <br />Note: <br />This is an ADU unit, the entrance is to the <br />right from the house through swing gate. <br />Thank you, <br />Contact Name: Alex shutov <br />Site Address: 829 56TH PL SW <br />Phone:4253873873 <br />e-Mail: andrew@progranite.com <br />(11/14/2019 12:25 PM SDP) <br />Ok to pour as noted: I highly suggest that <br />you pressure test your heating lines and <br />leave them on pressure during the pour and <br />construction process to detect if any <br />damage comes to them. 30# pressure is <br />recommended. <br />NOT READY 2/10/2020 12:23 PM Alex shutov <br />Pleae inspect interior walls for this ADU <br />project. Nothe that the unit is located on the <br />back of SFR . Please enter through swing <br />gate to the right of garage. I'll be on job site <br />between 9am -11 am, if you can please try <br />to stop by in between this time frame. <br />Thanks <br />Contact Name: Alex shutov <br />Site Address: 829 56TH PL SW <br />Phone:4253873873 <br />e-Mail: andrew@progranite.com <br />(2/11/2020 3:15 PM DWF) <br />Need Plumbing, Mechanical and Electrical <br />RI sign off before Framing inspection. <br />INSP12 CRWSYSTEws <br />
The URL can be used to link to this page
Your browser does not support the video tag.