My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 75TH ST SW SNO CO PUD 2021-12-28
>
Address Records
>
75TH ST SW
>
1122
>
SNO CO PUD
>
1122 75TH ST SW SNO CO PUD 2021-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 12:41:43 PM
Creation date
9/15/2021 3:36:27 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1122
Tenant Name
SNO CO PUD
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/8/2021 City of Everett <br />8:22:14AM <br />INSPECTION ACTIVITY REPORT <br />Permit No. B1803-006 Site Address 1122 75TH ST SW BLDG A <br />Applied 3/5/2018 Applicant HEWITT ARCHITECTS Lot <br />Approved 5/3/2018 Owner PUD #1 OF SNOHOMISH COUNTY Block <br />Issued 7/25/2018 Contractor WESTERN VENTURES CONST TYact <br />Parent Permit No. PW 1803-013 Description ENVELOPE MAINTENANCE, ROOF REPAIR <br />Notes PLANNING FINAL REQUIRED PRIOR TO BLDG FINAL. CONTACT KELSEY HEYD @ <br />425-257-7275. <br />Page 1 <br />Scheduled ComDleted TvDe Inspector <br />Result Remarks Inspector's Comments <br />8/23/2018 8/23/2018 BLDG DWF <br />OTHER Office building A <br />01-CONSULTATIO <br />Pre -con meeting <br />Note: Special inspection by Mayes. <br />Provide a final letter at building final. <br />10/19/2018 10/19/2018 BLDG DWF <br />OTHER Re -roof <br />01-CONSULTATIO <br />Curbing for new HVAC system <br />Note: special inspection by Mayes <br />Need final speical inspection letter at <br />building final. <br />11/9/2018 11/9/2018 <br />11 /28/2018 11 /28/2018 <br />12/4/2018 <br />5/9/2019 <br />11/8/2019 <br />11/13/2019 <br />11/9/2020 <br />4/7/2021 <br />4/8/2021 <br />SPECIAL DWF <br />INSPECTION <br />SPECIAL DWF <br />INSPECTION <br />12/4/2018 <br />REQUEST TEMP <br />DWF <br />CERTIFICATE OF <br />5/9/2019 <br />BLDG 15-FINAL <br />DWF <br />11/8/2019 <br />PERMIT <br />KLC <br />EXTENSION <br />11/13/2019 <br />BLDG 15-FINAL <br />DWF <br />11/9/2020 <br />PERMIT <br />KLC <br />EXTENSION <br />4/7/2021 <br />PLANNING <br />KIH <br />LANDSCAPING <br />4/8/2021 <br />BLDG 16-FINAL <br />KMK <br />APPROVAL <br />Roof nailing <br />APPROVAL <br />See notes <br />OTHER <br />Not ready <br />NO ACCESS <br />APPROVAL <br />Extended to 5/6/20 <br />NOT READY <br />EXTENSION A COVID <br />EXTENSION <br />APPROVAL ok to final <br />APPRVD-PERK <br />Received final special inspection letter from <br />Mayes Testing for: <br />Structural steel fabrication, erection, <br />welding, propietary anchors, reinforced <br />concrete. <br />360-420-0316 <br />Tyson:360-420-0316 <br />(11/13/2019 8:23 AM DWF) <br />Need Planning Dept sign off final before <br />Building Final inspection. <br />INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.