Laserfiche WebLink
Intake & Approval Sheet 10 (FOR PERMIT STAFF ONLV) 0 PERMIT #M Z. � o4 — ad -3 <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />Garage/Accessory Struct. Size <br />Number of Stories <br />Basement <br />[]No ❑Yes , <br />Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Fire Sprinklers: ❑Update Existing ❑New System <br />❑Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑Update Existing ❑New System <br />❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? []Yes ❑ No <br />Add'I RCW 64.55 docs required prior to final? ❑Yes ❑ No <br />VALUATION CALCULATION: Total $ <br />Additional Notes: <br />Approved By: Date: <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />❑Fire Sprinklers []FireAlarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />❑ Review / Inspection Scope - ADD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: Date: Z <br />Intake Comments: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />to Route to Other Departments <br />in Planning File Drawer <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes []No <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total $ <br />Calculated: Credit: <br />❑Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: <br />Approved By: Date: <br />PUBLIC WORKS <br />Intake OK by: Date: <br />. ................. ................... ......... ........ ...... ................ W,........... ..... ............ ......... <br />...-_, <br />Intake Comments: PW Worksheet Needed if. <br />i <br />T1Sys Dev Eval ❑Traffic Mit Eval <br />3 []Site Work or Drainage Proposed <br />s ❑Backflow Prevention for high hazard: <br />(dental, medical, animals, mortuary, hospital, <br />supportive housing) <br />:..................................................... .............. ......... ........ ...... ........................................... .......... <br />........ <br />❑Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder ❑Submitted Previously []Deferred <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (Join with this folder for permit issuance) <br />❑ Will be issued separately (separate Green Folder, PW issued ahead of Bldg) <br />❑ Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved By: Date: <br />