Laserfiche WebLink
Intake & Approval Sheet 0 (FOR PERMIT STAFF ONLY) 0 PERMIT # 10 b l '6 ql) <br />BUILDING <br />Intake OK by: Date: <br />Intake Commen <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />I <br />Bldg/TI/Addn/Rem Size <br />Garage/Accessory Struct. Size <br />Number of Stories <br />Basement <br />❑No ❑Yes , Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Fire Sprinklers: ❑Update Existing ❑New System <br />❑Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑Update Existing ❑New System <br />❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes <br />❑ No <br />Add'l RCW 64.55 docs required prior to final? ❑Yes <br />❑No <br />VALUATION CALCULATION: Total $ <br />Additional Notes: <br />Approved By: Date: <br />Cp F <br />IRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />El Fire Sprinklers ❑Fire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO F FEE <br />❑ Minimal or No Fire Scope O FIRE FEE <br />ElReview/ Inspection ope - ADD FIRE FEE <br />Approved By: Z Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />11_ <br />Intake OK by: �'iT Date: o <br />Intake Comments: Assign To: <br />Oq{ J �0 co�ng.n, POE <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />q <br />OK to Route to Other Departments — <br />old in Planning File Drawer <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />l,J, `% �vLc' 11 <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes 1)7No <br />"In Lieu" Fee: Type: Amount <br />School Impact Fee: Total $ <br />Calculated: Credit. <br />❑Everett School Dist ❑Mukilteo Sch of Dist <br />Additional Notes: . T_ G04yia," <br />bi`4j�') (to G i ti �npaQ� Vi <br />Approved By: <br />Date: 7. <br />PUBLIC WORKS <br />Intake OK by:- ITS Date: to [-Z to ISb 19 <br />----------------------------------------- <br />Intake Comments: ;PWWorksheet Needed if. <br />• <br />❑Sys Dev E al ❑Traffic Mit Eval <br />9LiF4S-t 5 ►waa,�tc� �p►� ; I to Work or Drainage Proposed <br />❑Backflow Prevention for high hazard: <br />(dental, medical, animals, mortuary, hospital, <br />:supportive housing) <br />---------------------------------- -- <br />ddw <br />oute this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND [Create Green Folder ❑Submitted Previously ❑Deferred <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder Qoin with this folder for permit issuance) <br />❑ Will be issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved By: Date: <br />