Laserfiche WebLink
97 Ft Monopole Tower Structural Analysis <br />Project Number 400087, Order 489086, Revision 0 <br />TABLE OF CONTENTS <br />1) INTRODUCTION <br />2) ANALYSIS CRITERIA <br />Table 1 - Proposed Equipment Configuration <br />3) ANALYSIS PROCEDURE <br />Table 2 - Documents Provided <br />3.1) Analysis Method <br />3.2) Assumptions <br />4) ANALYSIS RESULTS <br />Table 3 - Section Capacity (Summary) <br />Table 4 - Tower Component Stresses vs. Capacity - LC5 <br />4.1) Recommendations <br />5) APPENDIX A <br />tnxTower Output <br />6) APPENDIX B <br />Base Level Drawing <br />7) APPENDIX C <br />Additional Calculations <br />June 17, 2019 <br />CC/ BU No 823968 <br />Page 2 <br />tnxTower Report - version 8.0.5.0 <br />