My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1427 100TH ST SW 110 2021-12-13
>
Address Records
>
100TH ST SW
>
1427
>
1427 100TH ST SW 110 2021-12-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 8:49:21 AM
Creation date
9/16/2021 9:24:27 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1427
Unit
110
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />• If footings are rectangular, orient them so that the long side is perpendicular to <br />the home's I-beam. <br />• Place the bottom of footings on undisturbed soil or fill compacted to at least <br />900% of its maximum relative density. <br />• In freezing climates protect footings from the effects of frost rave in accord- <br />ance with any LAHJ requirements (see Prepare the Site, p. 10). Place the bot- <br />tom of the footings below the frost line (insulated foundations and monolithic <br />slabs are other frost protection options not covered in this manual). <br />• Make sure the top surface of the footing is level, flat, and smooth. <br />• In accordance with the American Concrete Institute publication ACI-308, main- <br />tain curing measures before construction or installation onto the concrete foot- <br />ing begins, until a minimum of 70% of the specified 2"ay compressive <br />strength has been achieved. The ACI recommended time to attain this level of <br />strength is seven days for ASTM C150 Type 1 mixtures and 10 days for Type II <br />mixtures. Full design live and dead loads may not be applied until the 28-day <br />duration has elapsed for achieving full strength. <br />Manufacturer's Instattati <br />Excavation. If <br />excavation is required, mark <br />the footing kxxtions on the <br />ground with stakes before <br />beginning to dig. <br />
The URL can be used to link to this page
Your browser does not support the video tag.