My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1427 100TH ST SW 110 2021-12-13
>
Address Records
>
100TH ST SW
>
1427
>
1427 100TH ST SW 110 2021-12-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 8:49:21 AM
Creation date
9/16/2021 9:24:27 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1427
Unit
110
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xi2 Lateral Stabilization with Concrete Footers <br />• <br />Approved Anchor" <br />with strap from <br />-- <br />I j <br />45 to 90 degrees <br />Xi2 Pier <br />Placement <br />I <br />3rd System <br />j <br />for Placement <br />-� <br />I <br />Single Section Home <br />Wind Zones 0 - 76' Box 2 Xi2 Systems <br />1 & 11 Over 76' Box 3 Xi2 Systems <br />Double Section Home <br />0 - 76' Box 2 Xi2 Systems <br />Over 76' Box 3 Xi2 Systems <br />Triple Section Home <br />0 - 76' Box 2 Xi2 Systems <br />Over 76' Box 3 Xi2 Systems <br />Wind Zones Single Section Home Double Section Home Triple Section Home <br />ll1 0 - &V Box 2 Xi2 Systems 0 - 64'-Box 2 X12 Systems 0 - 64' Box 2 Xi2 Systems <br />Over 64' Box 3 Xi2 Systems Over 64' Box 3 Xi2 Systems Over 64' Box 3 Xi2 Systems <br />For Wind Zone I - Approved anchor w/strap from 45 to 90 degrees, within 10' of end of home on single sections. <br />NOTE: Diagram represents single section up to 16' width, double section up to 32' width, and triple section homes up to 48' width. <br />Q <br />3. <br />4a. <br />4b. <br />5. <br />6. <br />7. <br />.................................... . ......................- <br />Installation of Concrete Bracket: Dry Set/Wet Set <br />Identify the number of systems to be used on the home using the <br />chart provided. <br />Identify the location where the lateral systems will be installed. If installing <br />lateral and longitudinal together, check page 4 for alignment of bracket. <br />Build pier according to State, Local or Home Manufacturers guidelines. <br />For dry set: drill two 3/8"x 3" deep holes in the concrete using holes in <br />galvanized bracket as a guide. Attach bracket to concrete pad using <br />3/8"x 3-1/2" wedge anchors provided. Place nut & washer on anchor, leave <br />enough room for 1 to 2 threads showing on top of bolt. Using a hammer, <br />tap the wedge bolts into hole through bracket, leaving nut & washer flush <br />with bracket Using a 9/16" socket wrench, tighten wedge/anchor bolt, <br />securing bracket to the concrete. <br />For wet set: align bracket and submerge legs completely in concrete. <br />Bottom of bracket should rest on surface. <br />Attach the end of the smaller tube to the bracket mounted on the pad, using the <br />grade 5,1/2" x 2-1/2" bolt/nut provided. <br />Attach the flag end of the larger tube to the opposite I-beam using the <br />"J" bolt over the top of the I-beam with the nut & washer provided. <br />(Figure 1 on last page) <br />Install a minimum of four (#14 x 1" Tek screws) self -tapping screws into <br />the holes provided in the lateral strut so that the two tubes are connected <br />together with a minimum overlap of 4" to 6" (Figure 2 on last page). <br />See "Footer Requirement" <br />on page 1 for edge <br />placement <br />
The URL can be used to link to this page
Your browser does not support the video tag.