Laserfiche WebLink
• • <br /> Intake & Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT# 2-54/- O`\ <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> ❑ Route to Commercial Building ❑ Attach to Project No. <br /> ❑ Route to Residential Building ❑ Route to Historic Reviewer <br /> ❑ Make this a"W"Permit ❑ OK to Route to Other Departments <br /> Bldg/TI/Addn/Rem Size 0 Hold in Planning File Drawer <br /> Garage/Accessory Struct.Size Zone <br /> Number of Stories Overlay/Agreement <br /> Basement ❑No ❑Yes, Fin/Unfin Nonresidential Use <br /> Type of Construction Residential Use <br /> Occupancy Group Proposed No.of Dwelling U'its: <br /> Occupancy Load Total No.of Dwelling Uni .: <br /> Fire Sprinklers: ❑Update Existing ❑New System ❑Not Req'd Planning/Landscape spection Required before Final? ❑Yes ❑No <br /> Reason Sprinklers Required: "In Lieu"Fee:Type: Amount$ <br /> Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd School Impact F- •: Total $ <br /> Reason Fire Alarm Required: Calculated: Credit: <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes era No ❑Everett hoot Dist ❑Mukilteo School Dist <br /> Add'RCW 64.55 docs required prior to final? ❑Yes 'BNo Addition- Notes: <br /> VALUATION CALCULATION: Total$ 67/L7->OC <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Intake OK by: Date: <br /> Additional Notes: Intake Comments: PW Worksheet Needed if: <br /> I❑Sys Dev Eval ❑Traffic Mit Eval <br /> I <br /> ❑Site Work or Drainage Proposed <br /> Approved By Date: Off/ � I❑Backflow Prevention for high hazard: <br /> S / (dental,medical,animals,mortuary,hospital, <br /> ;supportive housing) <br /> FIRE DEPARTMENT ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> Separate/Deferred Submittals Required: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> OFire Sprinklers ❑Fire Alarm ❑Other: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> Additional Notes: ❑ This Permit is Approved by Public Works <br /> 0 See PW Review Worksheet and associated attached items <br /> Fire Dept. Fees: ❑ A Separate PW Permit is Required (Permit#: PW ) <br /> ❑ Review of As-Built Plans-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ -Minimal or No Fire Scope-NO FIRE FEE CIIs in a Separate Green Folder(join with this folder for permit issuance) <br /> .pp Review/Inspection Scope-ADD FIRE FEE ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Approved By: K,Exo wq Date: R_r_,,, <br /> Et Public Works has no scope---PW Not Required <br /> Additional Notes: <br /> ELECTRICAL <br /> Additional Notes: <br /> Approved By: Date: Approved <br /> pP By: "j�1 Date: . ;I. 21 <br /> X. <br />