Laserfiche WebLink
Mechanical Requirements List, pg 1 of 25 <br /> 2018 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1-- Administered by©2021 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> Project: <br /> Harvey TI-2018 WSEC <br /> 6202 Associated Blvd <br /> Everett,WA 98201 <br /> Date:2021-06-14 <br /> Applies Code Section Code Provision Compliance Information Required In Permit Location in Building Department <br /> Documentation Documents Notes <br /> SCOPE <br /> C103.1 Construction For a shell&core or tenant space(first build- <br /> documents-General li out)project,indicate if there is no mechanical <br /> scope included in the project. <br /> NA C103.1 Construction For an alteration project,indicate if there is <br /> documents-General no mechanical scope included in the project. <br /> PERFORMANCE CRITERIA&SYSTEM DESIGN <br /> NA C403.1 Exempt process Identify equipment used by manufacturing, <br /> equipment industrial or commercial processes that are <br /> not for space conditioning or maintaining <br /> comfort and amentities for occupants;identify <br /> 1717 <br /> provisions applicable to this equipment perLLI 1 p.- <br /> C403.1 exception �, 1 <br /> C403.1.1 HVAC total system 1 For systems serving office retail,library or JUL 2 — ?1 <br /> `- performance ratio- -education occupancies,provide a TSPTrreport - — j � 1 <br /> (TSPR) that demonstrates the proposed design ratio is C[T ¢i <br /> I equal to or greater than the standard:reference d Op <br /> I design ratio,or exception applied pPPt'fjit , 5 w� <br /> pry- -- <br /> YES C403.1.2 Calculation of beating Provide load calculations performed per M701 a ' <br /> and cooling loads 1 ASHRAE Std 183 or equivalent,using design <br /> parameters per C302 and Appendix C; <br /> include load adjustments to account for <br /> energy recovery <br /> NA C403.1.3 Data centers Provide documentation that demonstrates that <br /> data center systems comply with the <br /> maximum allowed Design MLC and <br /> Annualized MLC per ASHRAE 90.4 with <br /> 2018 WSEC adjustments per climate zone <br /> NA C403.2.1 Zone isolation If there are HVAC zones that are intended to <br /> C403.4.2.2 be occupied non-simultaneously,identify <br /> isolation zone areas on plans;if multiple zones <br /> intended to be occupied simultanteously will <br /> I be combined into a single isolation zone, <br /> include on plans that the combined zone area <br /> does not exceed 25,000 sf and does not <br /> include more than one floor;or exception <br /> applied <br /> NA ! Indicate locations of associated zone isolation <br /> dampers in HVAC distribution system <br /> NA Refer to HVAC Controls section in <br /> Requirements List for applicable automatic <br /> setback and shutdown controls requirements <br /> EQUIPMENT SELECTION&PERFORMANCE <br /> Page 1/25 <br />