My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 LAUREL DR 2022-02-18
>
Address Records
>
LAUREL DR
>
600
>
600 LAUREL DR 2022-02-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 10:56:17 AM
Creation date
9/24/2021 10:38:19 AM
Metadata
Fields
Template:
Address Document
Street Name
LAUREL DR
Street Number
600
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/23/2020 <br />11:41:19XM <br />City of Everett <br />INSPECTION ACTIVITY REPORT <br />Page 1 12. <br />Permit No. B 1904-006 <br />Applied 4/4/2019 <br />Approved 5/20/2019 <br />Issued 5/23/2019 <br />Parent Permit No. <br />Site Address 600 LAUREL DR <br />Applicant FINCH MICHAEL Lot <br />Owner FINCH MICHAEL E & BRIANAN Block <br />Contractor OWNER TYact <br />Description RENOVATION TO EXISTING SFR/ INCLUDE ENCLOSURE OF <br />Notes <br />Scheduled <br />Completed <br />TyDe <br />Inspector <br />Result <br />Remarks <br />Inspector's Comments <br />7/22/2019 <br />7/22/2019 <br />BLDG <br />DWF <br />APPROVAL <br />eTRAKiT Inspection <br />7/19/2019 3:55 PM paul Kruse <br />03-FOUNDATION <br />Request <br />Contact Name: paul Kruse <br />Site Address: 600 LAUREL DR <br />Phone:4254226528 <br />e-Mail: lomiconst@comcast.net <br />7/22/2019 <br />7/22/2019 <br />BLDG <br />DWF <br />APPROVAL <br />eTRAKiT Inspection <br />7/19/2019 3:55 PM paul Kruse <br />02-FOOTING/SETB <br />Request <br />Contact Name: paul Kruse <br />Site Address: 600 LAUREL DR <br />Phone:4254226528 <br />e-Mail: lomiconst@comcast.net <br />7/29/2019 <br />7/29/2019 <br />BLDG <br />DWF <br />APPROVAL <br />AM requested <br />05-UNDERFLOOR <br />(7/29/2019 1:14 PM DWF) <br />Under floor framing ok to cover <br />(sheathing). <br />9/9/2019 <br />9/9/2019 <br />BLDG <br />DWF <br />PARTIAL APPR <br />AM Inspection requested <br />10-INTERIOR <br />(9/9/2019 9:32 AM DWF) <br />Shear wall - hold downs 4 location <br />basement support wall as per revised plans - <br />ok for concrete. <br />9/12/2019 <br />9/12/2019 <br />PLUMB <br />SDP <br />PARTIAL APPR <br />see notes <br />(9/12/2019 3:20 PM SDP) <br />02-GROUND <br />1) obtain a plumbing permit <br />2) ok underground for half bath in <br />basement. <br />9/13/2019 <br />9/13/2019 <br />BLDG 14-OTHER <br />DWF <br />OTHER <br />(9/13/2019 9:48 AM DWF) <br />Contractor intended to have a plumbing <br />inspection. <br />Need to obtain a plumbing permit as per <br />9/13/19 inspection <br />9/23/2019 <br />9/23/2019 <br />BLDG <br />DWF <br />PARTIAL APPR <br />(9/23/2019 10:44 AM DWF) <br />10-INTERIOR <br />Interior shear walls - basement and main <br />floor only- ok to cover. <br />12/20/2019 <br />12/20/2019 <br />BLDG <br />DWF <br />APPROVAL <br />Would like a.m. <br />(12/20/2019 9:37 AM DWF) <br />08-FRAMING <br />inspection <br />Contractor to complete air seal/ fire <br />blocking new holes. <br />And to install A35 post / beams for positive <br />connection. <br />Then ok to insulate <br />1/2/2020 <br />1/2/2020 <br />BLDG <br />BDGI <br />APPROVAL <br />GLEN OLIN 425-501-1531 <br />11-INSULATION <br />(1/2/2020 12:40 PM DWF) <br />Contractor to provide a copy of insulation <br />certificate at Building Final. - <br />Insulation installed in walls and attic. <br />INSPI2 CRWSYSTE S <br />
The URL can be used to link to this page
Your browser does not support the video tag.