My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2711 MAPLE ST 2021-09-28
>
Address Records
>
MAPLE ST
>
2711
>
2711 MAPLE ST 2021-09-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 11:05:52 AM
Creation date
9/24/2021 11:22:32 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2711
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/17/2021 Page <br /> 8:56:09AM City of Everett <br /> • INSPECTION ACTIVITY REPORT <br /> Permit No. C2005-002 Site Address 2711 MAPLE ST <br /> Applied 5/26/2020 Applicant COREY BOYD Lot <br /> Approved 9/21/2020 Owner DODGEN LAWRENCE SCOTT Block <br /> Issued 10/5/2020 Contractor GREATER SEATTLE CONSTRUCTION LLC Tract <br /> Parent Permit No. F 1912-001 Description FIRE DAMAGE REPAIR/ALL NEW INTERIOR FINISHES AND <br /> Notes AT BOTH LEVELS/REFRAME MAIN ENTRY STRUCTURE AND REPLACE DAMAGED <br /> RAFTERS AT WEST END OF RESIDENCE <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> *NO INSPECTION PTEC VOIDED(TAH 7/26/2021 11:19 AM GREATER SEATTLE <br /> CURRENTLY 8/6/2021) CONSTRUCTION LLC <br /> Will be onsite.Would like AM inspection if <br /> possible. <br /> Contact Name:GREATER SEATTLE <br /> CONSTRUCTION LLC <br /> Site Address:2711 MAPLE ST <br /> Phone:4259495601 <br /> e-Mail: <br /> mattf@greaterseattleconstruction.com <br /> 2/18/2021 2/18/2021 BLDG KMK CORRECTION see notes 2/17/2021 1:49 PM GREATER SEATTLE <br /> 07-EXTERIOR CONSTRUCTION LLC <br /> Contact Name:Matt Freidig <br /> Site Address:2711 MAPLE ST <br /> Phone:2069497969 <br /> e-Mail: <br /> mattf@greaterseattleconstruction.com <br /> (2/18/2021 7:11 AM KMK) <br /> Complete electrical correction: <br /> (1/28/2021 4:15 PM TJJO) <br /> All breakers for temp construction must be <br /> gfci protected <br /> Proper clearance needed in front of panel <br /> Electrician needs to have pud pull meter so <br /> inside of meter base can be inspected,may <br /> need new se conductors <br /> (2/18/2021 3:52 PM KMK) <br /> 1.Install densglass fire rated south side <br /> 2.Nail off west side <br /> 3.Repair rot north side <br /> Recall for shear and densglass nailing <br /> 4.Complete electrical correction <br /> 2/22/2021 2/22/2021 BLDG KMK APPROVAL eTRAKiT Inspection 2/19/2021 1:19 PM GREATER SEATTLE <br /> 07-EXTERIOR Request CONSTRUCTION LLC <br /> Contact Name:Matt Freidig <br /> Site Address:2711 MAPLE ST <br /> Phone:2069497969 <br /> e-Mail: <br /> mattf@greaterseattleconstruction.com <br /> INSP12 <br /> SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.