Laserfiche WebLink
8/17/2021 Page ,,1 <br /> 8:56:09AM • <br /> City of Everett 3/�, <br /> INSPECTION ACTIVITY REPORT <br /> 7/27/2021 7/27/2021 BLDG 16-FINAL KMK NOT READY See notes 7/26/2021 11:19 AM GREATER SEATTLE <br /> CONSTRUCTION LLC <br /> Will be onsite.Would like AM inspection if <br /> possible. <br /> Contact Name:GREATER SEATTLE <br /> CONSTRUCTION LLC <br /> Site Address:2711 MAPLE ST <br /> Phone:4259495601 <br /> e-Mail: <br /> mattf@greaterseattleconstruction.com <br /> (7/27/2021 2:58 PM KMK) <br /> Complete plumbing final. <br /> Add handrails to interior existing stairs as <br /> discussed.Will inspect crawl at next <br /> inpection. <br /> Rechedule for building final when the <br /> above is completed. <br /> 7/27/2021 7/27/2021 PLUMB 06-FINAL SDP CORRECTION eTRAKiT Inspection 7/26/2021 11:19 AM GREATER SEATTLE <br /> Request CONSTRUCTION LLC <br /> Will be onsite.Would like AM inspection if <br /> possible. <br /> Contact Name:GREATER SEATTLE <br /> CONSTRUCTION LLC <br /> Site Address:2711 MAPLE ST <br /> Phone:4259495601 <br /> e-Mail: <br /> mattf@greaterseattleconstruction.com <br /> (7/27/2021 9:49 AM SDP) <br /> The water heater in the crawl space is not <br /> code compliant.You need straps,insulating <br /> pad under the water heater,T&P pipe needs <br /> to be approved for hot water and it appears <br /> that the water heater is leaking. <br /> 7/27/2021 8/5/2021 MECH 06-FINAL SDP APPRVD-PERT' see notes 7/26/2021 11:19 AM GREATER SEATTLE <br /> CONSTRUCTION LLC <br /> Will be onsite.Would like AM inspection if <br /> possible. <br /> Contact Name:GREATER SEATTLE <br /> CONSTRUCTION LLC <br /> Site Address:2711 MAPLE ST <br /> Phone:4259495601 <br /> e-Mail: <br /> mattf@greaterseattleconstruction.com <br /> (8/5/2021 9:08 AM TAHU) <br /> I changed appoved to appoved permit final <br /> Note Shellie was out of the office today.I <br /> call her and discuss that change with her, <br /> and it is all good for appoved permit final. <br /> 7/28/2021 7/28/2021 PLUMB 06-FINAL SDP APPRVD-PERK As noted: 7/27/2021 1:55 PM GREATER SEATTLE <br /> CONSTRUCTION LLC <br /> HW Tank has been replaced and brought up <br /> to code. <br /> Contact Name:GREATER SEATTLE <br /> CONSTRUCTION LLC <br /> Site Address:2711 MAPLE ST <br /> Phone:2069497969 <br /> e-Mail: <br /> COREY@GREATERSEATTLECONSTRU <br /> CTION.COM <br /> (7/28/2021 10:20 AM SDP) <br /> Apply blocking between the water heater <br /> and the wall to prevent horizontal <br /> displacement of the water heater. <br /> INSP12 CRWS YS TEMS <br />