My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
802 E MARINE VIEW DR 2021-09-24
>
Address Records
>
E MARINE VIEW DR
>
802
>
802 E MARINE VIEW DR 2021-09-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2021 11:27:52 AM
Creation date
9/24/2021 11:27:49 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
802
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/17/2021 Page 2/ <br /> 9:03:22AM City of Everett 2 <br /> INSPECTION ACTIVITY REPORT <br /> 7/15/2021 Any 7/15/2021 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 7/9/2021 12:08 PM BEACON PLUMBING <br /> Request &MECHANICAL INC(ELEC) <br /> Contact Name:BEACON PLUMBING& <br /> MECHANICAL INC(ELEC) <br /> Site Address:802 E MARINE VIEW DR <br /> Phone:2067202040 <br /> e-Mail: <br /> QUTANA@BEACONPLUMBING.NET <br /> 7/9/2021 12:07 PM BEACON PLUMBING <br /> &MECHANICAL INC(ELEC) <br /> Contact Name:BEACON PLUMBING& <br /> MECHANICAL INC(ELEC) <br /> Site Address:802 E MARINE VIEW DR <br /> Phone:2067202040 <br /> e-Mail: <br /> QUTANA@BEACONPLUMBING.NET <br /> (Canceled-eTRAKiT-7/9/2021 12:08:31 <br /> PM) <br /> (7/15/2021 12:51 PM SKB) <br /> Looks like the waterline has been replaced <br /> and there's a new soft on copper line for the <br /> water going into the ground that must be <br /> connected to the grounding electrode <br /> conductor.Properly staple up the newly <br /> installed NM cable in the crawlspace. <br /> Connections on the grounding electrode <br /> must be tight.Grounding electrode's are <br /> drove together at the bottom they must be <br /> driven a part they are too close <br /> underground.Install the second strap above <br /> the meter on the mast.Provide access into <br /> the meter section for inspect the service <br /> entrance conductors terminations.You <br /> cannot use pointed screws for the panel <br /> cover.Provide AFCI protection as required <br /> per code for all newly installed NM cables. <br /> Give Description of what all new NM <br /> cables feed areas eTc. <br /> 7/20/2021 7/20/2021 *NO INSPECTION PTEC OTHER eTRAKiT Inspection 7/19/2021 3:34 PM BEACON PLUMBING <br /> CURRENTLY Request &MECHANICAL INC(ELEC) <br /> 253-391-4847 Please call In route for <br /> access <br /> Contact Name:BEACON PLUMBING& <br /> MECHANICAL INC(ELEC) <br /> Site Address:802 E MARINE VIEW DR <br /> Phone:2067202040 <br /> e-Mail: <br /> QUTANA@BEACONPLUMBING.NET <br /> (7/20/2021 11:01 AM TKJ) <br /> Sent no inspection selected email <br /> 7/21/2021 7/21/2021 ELEC 05-SERVICE SKB APPROVAL <br /> 7/21/2021 7/21/2021 ELEC 09-FINAL SKB CORRECTION (7/21/2021 11:00 AM SKB) <br /> Microwave must be on a dedicated 20 amp <br /> circuit and not on a 15 amp lighting circuit <br /> 8/5/2021 8/5/2021 ELEC 09-FINAL SKB APPRVD-PERN eTRAKiT Inspection 8/4/2021 11:40 AM BEACON PLUMBING <br /> Request &MECHANICAL INC(ELEC) <br /> Please call in route <br /> Contact Name:BEACON PLUMBING& <br /> MECHANICAL INC(ELEC) <br /> Site Address:802 E MARINE VIEW DR <br /> Phone:2067202040 <br /> e-Mail: <br /> accounting@BEACONPLUMBING.NET <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.