Laserfiche WebLink
7/21/2021 Page 1 <br /> City of Everett <br /> 8:41:01AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2105-191 Site Address 4205 OLIVE ST <br /> Applied 5/27/2021 Applicant BEACON PLUMBING Lot <br /> Approved 5/27/2021 Owner SHERRELL CHRISTOPHER S&SARAH R Block <br /> Issued 5/27/2021 Contractor BEACON PLUMBING&MECHANICAL INC(ELEC Tract <br /> Parent Permit No. Description Install 2 new 100amp sub panels <br /> Notes Panel A with 30 spaces next to main panel,Panel B with 20 spaces next to panel;new 240v 30amp circuit <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 6/2/2021 6/2/2021 ELEC 06-ROUGH MCB PARTIAL APPR eTRAKiT Inspection 6/1/2021 11:53 AM BEACON PLUMBING <br /> IN Request &MECHANICAL INC(ELEC) <br /> EARLIER IS BETTER <br /> Contact Name:BEACON PLUMBING& <br /> MECHANICAL INC(ELEC) <br /> Site Address:4205 OLIVE ST <br /> Phone:2067202040 <br /> e-Mail: <br /> QUTANA@BEACONPLUMBING.NET <br /> (6/2/2021 3:57 PM MCB) <br /> Floor and half wall for washer and dryer <br /> wiring only <br /> 6/4/2021 6/4/2021 ELEC 09-FINAL MCB NOT REQUIRE eTRAKiT Inspection 6/3/2021 3:21 PM BEACON PLUMBING <br /> Request &MECHANICAL INC(ELEC) <br /> Contact Name:BEACON PLUMBING& <br /> MECHANICAL INC(ELEC) <br /> Site Address:4205 OLIVE ST <br /> Phone:2067202040 <br /> e-Mail: <br /> QUTANA@BEACONPLUMBING.NET <br /> (6/4/2021 3:38 PM MCB) <br /> Inspection performed yesterday <br /> 7/20/2021 7/20/2021 ELEC 09-FINAL MCB APPRVD-PERI'v <br /> INSP12 <br />