Laserfiche WebLink
• 0 <br /> ENVELOPE COMPLIANCE SUMMARY <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Administered by:©2021 NEEA,All rights reserved <br /> Project Title Riverside POD Tenant Improvement-2018 For Building Department Use: <br /> WSEC I Date: Feb 02,2021 <br /> Project Address 405 Riverside RD <br /> Project&Applicant Everett,WA 98201 <br /> Information Applicant Name Dale Couture <br /> Applicant 253-677-2815 <br /> Phone <br /> Applicant pdcouture@tahomadesigngroup.com <br /> Email <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Use Type Office,Other Building Cond.Floor 1 <br /> Area <br /> Project Cond.Floor 0 <br /> Area <br /> Project Sco a Tenant Spaces—First Build Space Conditioning Fully <br /> p Out Categories Conditioned Floors Above Grade I <br /> Compliance Method Compliance Method 1- <br /> General <br /> Envelope Project Description This is a 1,300 SF office TI for an existing building.the balance of the building is a semi heated warehouse that was approved as <br /> such under the 2015 WSEC <br /> Envelope Space ConditioningCompliance WWR/SRR <br /> p p p Fenestration Compliance <br /> Compliance Scope Category Method per UA Calculation Adjustment Alternates Verification <br /> Scope and Category <br /> Method Tenant Spaces—First o0% No Calculation Adjustments <br /> Build Out Fully Conditioned Prescriptive 5.17/a/ allowed No alternates selected COMPLIES <br /> Air Barrier Testing Air barrier testing not included Air Barrier Comments Existing Building was Air Barrier <br /> tested <br /> Project Title Riverside POD Tenant Improvement-2018 WSEC Date Feb 02,2021 / <br /> Scope&Space ConditioningTENANT SPACES—FIRST BUILD OUT-FULLY Compliance <br /> p p CONDITIONED Verification COMPLIES <br /> Window-to-wall Ratio 5.17% Skylight-to-roof-ratio 0% Vertical Fenestration No alternates <br /> Alternate selected <br /> Opaque Envelope Assemblies <br /> Insulation R-Values <br /> Continuous Insulated Net Area <br /> Walls Location in Documents Assembly ID Assembly Location Cavity (% Wall U-Factor (SF) <br /> penetration) Furring <br /> Wood-framed and other- A 1.01 Wall Type 2 Exterior R-21 R-0 <0.04% <br /> Commercial yp ( ) U-0.054 744 <br /> Which insulation code target does wall comply with?:R-21 Cavity+ U-Factor Source:WSEC Appendix A <br /> Intermediate Framing <br /> U-Factor Source Description:Table C402.1.4 Wall Framing Type(Standard,Inter.,Advanced):Intermediate <br /> Framing Depth:2x6 Framing Spacing:16"o.c. <br /> Wood-framed and other- A1.01 Wall Type 3 Exterior R-21 R-0(<0.04%) U-0.054 741 <br /> Commercial <br /> Which insulation code target does wall comply with?:R-21 Cavity+ U-Factor Source:WSEC Appendix A <br /> Intermediate Framing pp <br /> U-Factor Source Description:Table C402.1.4 Wall Framing Type(Standard,Inter.,Advanced):Intermediate <br /> Framing Depth: Framing Spacing:16"o.c. <br /> Slab-on-grade Floors Location in Documents Assembly ID Assembly Location Slab Edge Under Slab F-Factor Perimeter <br /> Length(SF) <br /> Unheated slab A2.01,A3.0I Edge of Slab At grade level R-0 R-0 F-0.54 150 <br /> F-Factor Source Description: F-Factor Source:WSEC Appendix A <br /> Slab Insulation Method:Uninsulated slab <br /> Fenestration&Opaque Door Assemblies <br /> Insulation R-Values <br /> Rough <br /> Opaque Doors Location in Documents Assembly ID Assembly Location Door Insulation U-Factor Opening <br /> (SF) <br /> Swinging A1.02 Door A and B Interior partition R-2.70 U-0.37 84 <br /> What percentage of this opaque door is glazing?:50%or less U-Factor Source:WSEC Appendix A <br /> U-Factor Source Description:Table A107.1(1) <br /> Fenestration Fenestration Rough <br /> Vertical Fenestration Location in Documents Assembly ID Assembly Location Orientation Shading(PF) Opening <br /> SHGC U-Factor (eni <br />