My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 9/29/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County PUD 9/29/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2021 11:34:51 AM
Creation date
10/1/2021 11:34:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
9/29/2021
Council Approval Date
9/8/2021
End Date
9/30/2023
Department
Public Works
Department Project Manager
Jeff Marrs
Subject / Project Title
Clean Water Energy Coaching
Tracking Number
0003056
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRATEGIC ENERGY MANAGEMENT (SEM) FUNDING AGREEMENT <br /> PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY <br /> and <br /> CITY OF EVERETT <br /> CW2245325SEM City of Everett Clean Water Cohort <br /> This Strategic Energy Management("SEM") Funding Agreement("Agreement") is executed by and between Public <br /> Utility District No. 1 of Snohomish County (UTILITY) and the City of Everett (END USER) for its facility at 3200 <br /> Cedar St., Everett, WA, 98201 (Service Address). The UTILITY and END USER are also referred to herein <br /> individually as "Party" and collectively known as the"Parties." <br /> WHEREAS, END USER has facilities in UTILITY's service area and purchases power from UTILITY; and <br /> WHEREAS, UTILITY is a public utility organized under the laws of the State of Washington, and sells <br /> electric power to END USER that is acquired from Bonneville Power Administration (BPA); and <br /> WHEREAS, BPA provides funds to UTILITY to pass through to END USER as the END USER implements <br /> energy saving measures and completes related activities under the BPA SEM program at END USER's facility; and <br /> WHEREAS, The Parties agree to enter into a two-year BPA SEM Program engagement, herby referred to <br /> as Clean Water Energy Coaching (CWEC), which emphasizes participation in CWEC training sessions and <br /> implementation of low-cost energy efficiency measures. <br /> NOW, THEREFORE, the PARTIES hereby agree to the following: <br /> 1. This Agreement is effective upon execution and will continue until the PARTIES' obligations have been <br /> met. If this Agreement has not been executed (signed) by END USER and returned to the UTILITY within <br /> 30 calendar days of being executed by UTILITY, the terms of this Agreement shall be null and void. <br /> 2. END USER shall designate a CWEC "Executive Sponsor" to provide management support for the <br /> implementation of this project by completing Exhibit 1 of the Agreement. <br /> 3. END USER shall designate a CWEC "Energy Champion" to (a) attend training workshops; (b) coordinate <br /> END USER's implementation activities; (c) serve as the primary contact for the CWEC Providers (Energy <br /> Smart Industrial Technical Service Providers, Energy Smart Industrial Program staff); (d) implement <br /> suitable SEM action items; and (e) track implementation dates and if necessary, associated costs by <br /> completing Exhibit 1 of the agreement. <br /> 4. If agreed to by END USER and UTILITY, the Energy Champion will oversee the design and installation of <br /> a Performance Tracking System(PTS), capable of measuring and tracking energy consumption and energy <br /> savings performance. The Energy Champion will track installation costs and provide the data required to <br /> complete the PTS Verification Report. <br /> 5. END USER agrees to provide BPA, its designated CWEC Provider, and UTILITY with the information <br /> necessary to establish and maintain a baseline energy model(Monitoring,Targeting,and Reporting[MT&R] <br /> model). The MT&R model will define the pre-engagement baseline and measure the energy savings <br /> associated with the implementation of END USER's CWEC program. Necessary information includes <br /> electric energy consumption and plant loading data, and may also include natural gas consumption and <br /> any other relevant data that would impact electrical energy use. <br /> Energy Smart <br /> Industrial <br /> SEM Funding Agreement 1 <br /> Reviewed by JK 20210615 <br />
The URL can be used to link to this page
Your browser does not support the video tag.