My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2022-01-19
>
Address Records
>
AIRPORT RD
>
8925
>
MUKILTEO SCHOOL DISTRICT
>
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 8:57:31 AM
Creation date
10/13/2021 1:21:36 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
8925
Tenant Name
MUKILTEO SCHOOL DISTRICT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER SITE PLAN <br />FEBRUARY 26, 2018 <br />MUKILTEO SCHOOL DISTRICT - TRANSPORTATION PAGE 1 <br />PROJECT OVERVIEW <br />This Stormwater Site Plan has been prepared for the Mukilteo School District's Transportation <br />Facility at 9001 Airport Way, Everett, WA. The site is used as an operations center and much of <br />the area is given over to the storage of buses. The project is to add paving to the southeast <br />edge of the existing parking area to provide for 6 additional bus stalls. See Figure 3: Developed <br />Conditions. <br />Project Totals: <br />New Impervious: 4,400 sf <br />Replaced Impervious: 0 sf <br />METHODOLOGY <br />The drainage design for the project has been prepared based on the requirements of the 2014 <br />Stormwater Management Manual for Western Washington, as adopted by the City of Everett. <br />With greater than 35% existing impervious, the site is considered a Redevelopment Site. <br />According to Figure 1-2.4.2 Flow Chart for Determining Requirements for Redevelopment <br />(attached in Appendix B), the development will need to meet Minimum Requirements 1-5. <br />MR 1: PREPARATION OF STORMWATER SITE PLANS <br />DRAINAGE PLAN DESCRIPTION <br />Direct precipitation is the source of runoff. The new paving will sheet flow onto the existing <br />pavement to be collected in the existing stormwater system. <br />WATER QUALITY MEASURES <br />Following is a list of the possible construction water quality BMPs. See MR 3: Water Pollution <br />Source Control for more information. The BMPs are as follows: <br />BMP C103, High Visibility Fence: <br />BMP C107, Construction Road/Parking Area Stabilization: <br />BMP C120, Temporary and Permanent Seeding: <br />BMP C121, Mulching: <br />BMP C123, Plastic Covering <br />BMP C125, Topsoil ing/Composting: <br />BMP C140, Dust Control: <br />BMP C220, Storm Inlet Protection: <br />BMP C233, Silt Fence <br />CONVEYANCE CALCULATIONS <br />Conveyance calculations will not be required as no new storm collection system is proposed. <br />The additional impervious is minor and will not significantly impact the existing collection <br />system. <br />P:\Work\Prcjects\2012\l2-185 Mukilteo SD\CODOCS\Transportation Facility Drainage 12-185.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.