Laserfiche WebLink
• 0 <br />2019 System Development Fee Calculations <br />Permit #: PW1902-019 <br />Additional Notes: <br />Project Address: 8925 AIRPORT ROAD <br />Project Name: SITE WORK -TRANSPORTATION FACILITIES <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Outside City Limits? No *Adds a 25%Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />0-� <br />Prepared Date: 6 "� <br />I �q <br />Reviewed By: Date: l <br />Fee Calculations: <br />Water & Sewer System Development Fees: <br />Domestic Meter: Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />'Subject to Administrative Guidelines Proposed Building Use: <br />School Previous Bldg Use #1: No Other Use Previous Bldg Use #2: No Other Use <br />Previous Bldg Use #3: <br />No Other Use <br />ProposeclUnit Measure: <br />1 Student Unit Measure for Use #1: 1 None Unit Measure for Use #2: 1 None <br />Unit Measure for Use #3: <br />1 None <br />Note: Meter Size Used for Proposed Meter Size: <br />Calculation Water Fee: <br />Sewer Fee: <br />None Credited Meter #1 Size: None Credited Meter #2 Size: None <br />$0.00 Water Credit #1: $0.00 Water Credit #2: <br />$0.00 Sewer Credit #1: $0.00 Sewer Credit #2: <br />Credited Meter #3 Size: <br />Water Credit #3: <br />Sewer Credit V <br />None <br />S0.00 <br />$0.00 <br />Total Fees Due: Add to Utility Permit for Domestic Meter <br />_ <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Sewer Sys Dev Fee Total: <br />$0.00 <br />This fee reflects Credit for existing water meter <br />Total: <br />$0.00 <br />Irrigation Meter: Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />None Credited Meter Size: None <br />Water Fee: <br />$0.00 Water Credit: $0.00 <br />No Sewer Fee: <br />$0.00 No Sewer Credit: $0.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: <br />1 <br />$0.00 <br />1 Irrigation meters are only subject to the water portion of system development fees <br />Total: <br />$0.00 <br />Fire Meter: Proposed Meter Size: <br />None <br />I For informational purposes only <br />Permit #: U No Sys Dev Fees: <br />$0.00 <br />IFire meters are not subject to system development fees <br />Stormwater System Development Fees: <br />Permit #: it '\114 (162- - C] ► `[ Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />4,635 1 SF <br />Stormwater System Dev Fee: $1,152.72 Add this fee to the Building Permit (or Public Works Permit if there is no building permit for the project) <br />