My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2022-01-19
>
Address Records
>
AIRPORT RD
>
8925
>
MUKILTEO SCHOOL DISTRICT
>
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 8:57:31 AM
Creation date
10/13/2021 1:21:36 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
8925
Tenant Name
MUKILTEO SCHOOL DISTRICT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br />2019 System Development Fee Calculations <br />Permit #: PW1902-019 <br />Additional Notes: <br />Project Address: 8925 AIRPORT ROAD <br />Project Name: SITE WORK -TRANSPORTATION FACILITIES <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Outside City Limits? No *Adds a 25%Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />0-� <br />Prepared Date: 6 "� <br />I �q <br />Reviewed By: Date: l <br />Fee Calculations: <br />Water & Sewer System Development Fees: <br />Domestic Meter: Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />'Subject to Administrative Guidelines Proposed Building Use: <br />School Previous Bldg Use #1: No Other Use Previous Bldg Use #2: No Other Use <br />Previous Bldg Use #3: <br />No Other Use <br />ProposeclUnit Measure: <br />1 Student Unit Measure for Use #1: 1 None Unit Measure for Use #2: 1 None <br />Unit Measure for Use #3: <br />1 None <br />Note: Meter Size Used for Proposed Meter Size: <br />Calculation Water Fee: <br />Sewer Fee: <br />None Credited Meter #1 Size: None Credited Meter #2 Size: None <br />$0.00 Water Credit #1: $0.00 Water Credit #2: <br />$0.00 Sewer Credit #1: $0.00 Sewer Credit #2: <br />Credited Meter #3 Size: <br />Water Credit #3: <br />Sewer Credit V <br />None <br />S0.00 <br />$0.00 <br />Total Fees Due: Add to Utility Permit for Domestic Meter <br />_ <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Sewer Sys Dev Fee Total: <br />$0.00 <br />This fee reflects Credit for existing water meter <br />Total: <br />$0.00 <br />Irrigation Meter: Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />None Credited Meter Size: None <br />Water Fee: <br />$0.00 Water Credit: $0.00 <br />No Sewer Fee: <br />$0.00 No Sewer Credit: $0.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: <br />1 <br />$0.00 <br />1 Irrigation meters are only subject to the water portion of system development fees <br />Total: <br />$0.00 <br />Fire Meter: Proposed Meter Size: <br />None <br />I For informational purposes only <br />Permit #: U No Sys Dev Fees: <br />$0.00 <br />IFire meters are not subject to system development fees <br />Stormwater System Development Fees: <br />Permit #: it '\114 (162- - C] ► `[ Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />4,635 1 SF <br />Stormwater System Dev Fee: $1,152.72 Add this fee to the Building Permit (or Public Works Permit if there is no building permit for the project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.