Laserfiche WebLink
Firefox <br />about:blank <br />STEP 1. DETERMINE APPLICABILITY T <br />Use the criteria below to determine if this template may be used for your project If any <br />criteria below are marked "False," this template may nt be used and a report meeting <br />City standards is required and shall be prepared by a professional Engineer licensed in the <br />State of Washington. Flow control facilities shall be designed by an engineer for projects <br />with 2.000 sf or more net new impervious area (see Step 61. <br />This projectwill create atka%2000fl2 of new plus replaced impervious surface <br />area xatleast200sfafnetneoirripwAxisam, <br />i J <br />projectwill ovic less than 5,000 ft2 ofnew plus replaced impervious surface <br />�This <br />area. <br />This project drains to the combined sewer. <br />✓ <br />project converts less than 3M acre of existing soil cover or vegetation to <br />IThis <br />lawn or landscapeareas. <br />�I <br />This project will n-91 adversely impact a water of the state. <br />This projectwill not change a natural drainage course and will not generate any <br />new concentrated flows leaving the site. <br />✓ <br />This project will not be constructed within a critical area or a critical area buffer <br />and will not adversely impact a. critical area. See the City of Everett Municipal <br />Code, Title 19.37. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Prgects in <br />the Combined Sewer Area -April 2021 <br />Wi <br />J <br />� 3�4 1� YZ 10 <br />�2o 23 <br />6/8/2021, 10:18 AM <br />