My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2318 BAKER AVE 2022-01-19
>
Address Records
>
BAKER AVE
>
2318
>
2318 BAKER AVE 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 9:31:25 AM
Creation date
10/14/2021 8:14:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Firefox <br />about:blank <br />Step S. Construction Storwater Pollution Prevention <br />(SWPPP) <br />All new development and redevelopment projects are responsible for preventing erosion and discharge of <br />sediment and other pollutants into receiving waters. A Construction Stormwater Pollution Prevention Plan <br />(Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br />management concerns. A copy of this SWPPP is required to be kept by the contractor performing the work at <br />the jobsite for reference and updating during the duration of construction. <br />?NatuTask 1: Describe the project during construction <br />re <br />(You may attach a narrative that answers the following questions) and purpose of the construction project. <br />In <br />To construct a detached garage on 0.14 ac site. <br />Oli <br />5 <br />Adjacent areas, including streams, lakes, wetlands, residential areas, and roads that might be <br />affected by the construction project <br />No Impacts are anticipated to adjacent areas including streams, lakes wetlands <br />residential areas and roads. <br />How upstream ydrainage areas may affect the site: <br />No upstream areas contribute runoff to the development area of the site. <br />Downstream drainage leading from the site to a receiving body of water: <br />Runoff from the rear yard of 2318 Baker Ave drains to the alley flowing south to <br />24th ST to SMH 103.62 of combined sever and drainage system. <br />City of Everett Public Works <br />Small Pro)ecl Stormwater Site Plan RepW for Projects in <br />the Combined Sewer Area -April 2021 <br />- 8 of 23) <br />6/8/2021, 10:18 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.