Laserfiche WebLink
2021 Stormwater System Development <br />Fee Calculations <br />Permit #: B2104-023 <br />Additional Notes: <br />Prnject Address: 2318 Baker Ave <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: CONST OF 20'X24' DETACHED GARAGE <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Prepared By: THAD NEWPORT Date: 7/9/2021 <br />Sewer District: I Everett <br />Outside City Limits? INo *Adds a 25%Surcharge <br />Supportive Housing Credit? INo *Reduces by 80% <br />1 Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit#: BXXXX-XXX Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PW2107-020 Type of Construction: lExisting Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surtaces:l <br />604 1 SF <br />Stormwater System Dev Fee: 1 <br />$159.03 jAdd this fee to the Public Works Permit for hard surfaces on the ground. <br />0 <br />