Laserfiche WebLink
2021 Stormwater System Development <br />Fee Calculations <br />Permit PW2101-011 <br />Additional Notes: <br />Project Address: 2614 COLBY AVE <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: NEW SIDE SEWER <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following questions (Required): All Yellow Inputs <br />Water District: Everett <br />Prepared By: THAD NEWPORT Date: 1/6/2021 <br />Sewer District: Everett <br />Outside City Limits? No *Adds a 25%Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit#: BXXXX-XXX Type of Construction: Existing Development Adding <br />New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PW2101-011 Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />3811 SF <br />Stormwater System Dev Fee: <br />$100.32 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />0 <br />0 <br />