10/11/2021 <br />City of Everett <br />11:04:25AM <br />INSPECTION ACTIVITY REPORT <br />Permit No. C 1802-005 Site Address 3710 COLBY AVE <br />Applied <br />2/5/2018 <br />Applicant CLM PROPERTY SOLUTIONS LLC Lot <br />Approved <br />7/3/2018 <br />Owner CLM PROPERTY SOLUTIONS LLC Block <br />Issued <br />7/10/2018 <br />Contractor CLETE M CONSTRUCTION LLC Tract <br />Parent Permit No. <br />PW 1806-027 <br />Description NEW TOWNHOME UNIT <br />Notes CONVERT SFR INTO 3 UNIT TOWNHOME. LANDSCAPE INSPECTION REQ'D PRIOR TO <br />BUIDLING FINAL. CONTACT KELSEY HEYD @425-257-7275. <br />Page 1 <br />Scheduled <br />Completed <br />TvDe <br />Inspector <br />Result <br />Remarks <br />Inspector's Comments <br />7/19/2018 <br />7/19/2018 <br />BLDG 13-OTHER <br />KMK <br />CORRECTION <br />Clean out sludge. Wet material before pour. <br />Recall for inspection. <br />7/20/2018 <br />7/20/2018 <br />BLDG <br />KMK <br />CORRECTION <br />1. Add rebar per plan <br />03-FOUNDATION <br />2. Place HTT4 hardware before pour. <br />3. Sit dowels per plan (24" OC) provide <br />special inspection report. Recall for <br />inspection. <br />7/23/2018 <br />7/23/2018 <br />BLDG <br />KMK <br />CORRECTION <br />Provide special inspection reports for <br />02-FOOTING/SETB <br />footing, rebar placement, HDs, and epoxied <br />dowels. <br />7/25/2018 <br />7/25/2018 <br />BLDG <br />KMK <br />APPROVAL <br />See special <br />02-FOOTING/SETB <br />inspection <br />7/25/2018 <br />7/25/2018 <br />BLDG <br />KMK <br />APPROVAL <br />See special <br />03-FOUNDATION <br />inspection <br />7/25/2018 <br />7/25/2018 <br />BLDG 13-OTHER <br />KMK <br />APPROVAL <br />Structural slab, see <br />special inspection <br />12/18/2018 <br />12/18/2018 <br />PLUMB <br />DXW <br />CORRECTION <br />1.2nd floor no water pipe to be in party <br />03-ROUGH IN <br />wall <br />2. Vent on top floor to be 4ft from party <br />wall through roof. Complete back water <br />valve. <br />3. Rough in gas pipe ok 15psi <br />4. Relief line to properly drain or use 2nd <br />125psi <br />12/18/2018 <br />12/18/2018 <br />GAS 01-ROUGH IN <br />DXW <br />APPROVAL <br />15 # test <br />12/27/2018 <br />12/27/2018 <br />PLUMB <br />SDP <br />APPROVAL <br />125# T&P on sink at <br />03-ROUGH IN <br />final <br />8/15/2019 <br />8/15/2019 <br />BLDG <br />KMK <br />NOT READY <br />call for electrical and <br />08-FRAMING <br />mechanical inspe <br />8/16/2019 <br />8/16/2019 <br />MECH 04-ROUGH <br />SDP <br />APPROVAL <br />406-390-3676 <br />IN <br />8/19/2019 <br />8/19/2019 <br />BLDG <br />TMB <br />CORRECTION <br />See Notes <br />406-390-3676 <br />08-FRAMING <br />(8/19/2019 3:30 PM TMB) <br />1. Floor joists are 2" by 8"- plans show 2" <br />by 10". <br />provide engineering solution/revision. <br />2. Fire walls must extend to roof @ attic. <br />No openings allowed within 4 ft of fire <br />walls. <br />Use putty packs at outlet boxes @ firewalls. <br />3. Fireblocks missing throughout structure. <br />Provide positive connections at post beam <br />connections. consult with engineer to <br />provide solution. <br />4. 2 layers of GWB required behind tubs <br />and any sub -framed areas. <br />5. Provide 6'8" headroom @ stairs at all <br />locations. <br />9/23/2019 <br />9/23/2019 <br />BLDG <br />KMK <br />APPROVAL <br />(9/23/2019 2:17 PM KMK) <br />02-FOOTING/SETB <br />OK to pour <br />INSP12 CRWSYSTEMS <br />