Laserfiche WebLink
Intake & Approval Sheet * (FOR PERMIT STAFF ONLr <br />PERMIT # <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />Garage ccesso Struct.. Size <br />,S 9 <br />Number o ones <br />Basement <br />ENNo ❑Yes , Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Fire Sprinklers: ❑Update Existing ❑New System ❑Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes D No <br />Add1 RCW 64.55 docs required prior to final? ❑Yes CRNo <br />VALUATION CALCULATION: Total $ JR GZ <br />eA,� 9WV-s A"6 = gtoLk(c 2 .C) <br />� AtIX004N- A1.'s- 5Ir-. or Pub <br />Additional Notes: ` o /S //2-c- <br />Oct ` gL45o O <br />Approved By: Date: C <br />al 11 2a <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />❑Fire Sprinklers El Fire Alarm ❑Other: <br />Additional Notes: ; <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />❑ Review/ Inspection Scope -ADD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: Date: <br />Intake Comments: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />❑ OK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone y. <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total $ <br />Calculated: Credit: <br />❑Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: A fero-f-A -5.),,,T re ji� f&,\ d n <br />Approved By: T T�l <br />Date: ZC)z C) <br />I_ I <br />PUBLIC WORKS <br />Intake OK by. Date: <br />.._ ............ ..........................m.-_........_. <br />Intake Comments:=PWWorksheetNeeded if.• <br />!OSys Dev Eval ❑Traffic Mit Eval <br />OSite Work or Drainage Proposed <br />€0Backflow Prevention for high hazard: <br />;(dental, medical, animals, mortuary, hospital, <br />-supportive housing) <br />€............_ ......... <br />....._..........................,,....-...............,..................._..... <br />..�....... <br />....- <br />❑ Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (join with this folder for permit issuance) <br />❑ Will be issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />❑ Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved By: Date: <br />