Laserfiche WebLink
INSPECTION REPORT <br />Date ___01-13MB Permit: _0-00"-03---- - --- <br />Contractor: <br />Owner: Q 'f_Co — _-solubo— -- <br />Site Address: �71t__ p <br />ELECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ Slab/Conduit <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Footing drains. <br />❑ Roof drains <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />❑ LIFER ground <br />❑ Groundwork/Slab <br />❑ Footing <br />❑ Rough In <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Structural Slab <br />❑ OK to insulate <br />Framing <br />❑ Rooftop Units <br />❑ Insulation <br />❑ Mechanical Final <br />❑ Drywall Nailing <br />❑ Shear Nailing <br />❑ Roof Nailing <br />❑Ceiling Grid <br />❑ Building Final <br />OTHER OR CONSULTATION: <br />GAS PIPE <br />❑ Rough In/Service <br />❑ Refrigeration <br />❑ Gas Pipe Final <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />❑ Plumbing Final <br />Hot Water Tank <br />❑ Rough in <br />❑ HWT Final <br />❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br />E1J,OK,PM C.O. ❑ VIOLATION <br />AI,E TO PERFORM INSPECTION: <br />LL (425) 257-8881 FOR REINSPECTION — 24 hour note required <br />Inspector: Date: 0 <br />EIR (10/06) DATABAR, INC. <br />