My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3714 COLBY AVE 2022-01-27
>
Address Records
>
COLBY AVE
>
3714
>
3714 COLBY AVE 2022-01-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 11:02:33 AM
Creation date
10/14/2021 10:32:14 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3714
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/11/2021 City of Everett <br />11:20:31AM <br />INSPECTION ACTIVITY REPORT <br />Permit No. C1802-003 Site Address 3714COLBYAVE <br />Applied 2/5/2018 Applicant CLM PROPERTY SOLUTIONS LLC Lot <br />Approved 7/2/2018 Owner CLM PROPERTY SOLUTIONS LLC Block <br />Issued 7/10/2018 Contractor CLETE M CONSTRUCTION LLC Tract <br />Parent Permit No. PW 1806-027 Description NEW TOWNHOME UNIT <br />Notes CONVERT SFR INTO 3 UNIT TOWNHOME. LANDSCAPE INSPECTION REQ'D PRIOR TO <br />BUIDLING FINAL. CONTACT KELSEY HEYD @425-257-7275. <br />Page <br />Scheduled <br />COmDleted <br />TVDe <br />Insoector <br />Result Remarks <br />InSDector's Comments <br />7/19/2018 <br />7/19/2018 <br />BLDG 13-OTHER <br />KMK <br />CORRECTION <br />Clean out sludge. Wet material before pour. <br />7/20/2018 <br />7/20/2018 <br />BLDG <br />KMK <br />CORRECTION <br />1. Add rebar per plan <br />03-FOUNDATION <br />2. Place HTT 4 hardware before pour. <br />3. Set dowels per plan (24" OC). Provide <br />special inspection report. <br />Recall for inspection. <br />7/23/2018 <br />7/23/2018 <br />BLDG <br />KMK <br />CORRECTION <br />Provide special inspection reports for <br />02-FOOTING/SETB <br />footing, rebar placement, HDs, and epoxied <br />dowels. <br />(7/24/2018 8:27 AM JMN) <br />P <br />7/25/2018 <br />7/25/2018 <br />BLDG <br />KMK <br />APPROVAL <br />See special <br />02-FOOTING/SETB <br />inspection <br />7/25/2018 <br />7/25/2018 <br />BLDG <br />KMK <br />APPROVAL <br />See special <br />03-FOUNDATION <br />inspection <br />7/25/2018 <br />7/25/2018 <br />BLDG 13-OTHER <br />KMK <br />APPROVAL <br />Structural slab, see <br />special inspection <br />8/14/2018 <br />8/14/2018 <br />BLDG <br />DWF <br />CORRECTION <br />08-FRAMING <br />8/14/2018 <br />8/14/2018 <br />ELEC 08-OTHER <br />MCB <br />OTHER <br />Consultation. No <br />electrical permit <br />12/20/2018 <br />12/20/2018 <br />PLUMB <br />DXW <br />CORRECTION <br />03-ROUGH IN <br />12/20/2018 <br />12/21/2018 <br />12/27/2018 <br />1/14/2019 <br />12/20/2018 <br />12/21/2018 <br />12/27/2018 <br />1/14/2019 <br />GAS 01-ROUGH IN DXW <br />PLUMB SDP <br />02-GROUND <br />PLUMB <br />03-ROUGH IN <br />BLDG <br />10-INTERIOR <br />SDP <br />DWF <br />APPROVAL pressure test <br />CORRECTION <br />APPROVAL <br />PARTIAL APPR <br />8/15/2019 <br />8/15/2019 <br />BLDG KMK <br />NOT READY <br />08-FRAMING <br />8/16/2019 <br />8/16/2019 <br />MECH 04-ROUGH SDP <br />APPROVAL <br />IN <br />8/19/2019 <br />8/19/2019 <br />BLDG TMB <br />CORRECTION <br />08-FRAMING <br />9/27/2019 <br />9/27/2019 <br />BLDG KMK <br />CORRECTION <br />08-FRAMING <br />125# T&P on sink at <br />final <br />Need electrical permit and rough in before <br />framing inspection. <br />1. Back water valve required on first floor <br />fixtures. <br />Hot water relief line to properly drain or use <br />2nd 125psi at kitchen sink. <br />Circuit vent to be to UPC. <br />2. Rough in gas pipe ok 15psi. <br />(12/21/2018 2:31 PM SDP) <br />1) install backwater valve on basement <br />plumbing only. Disconnect 3" stack and tie <br />into the building drain downstream of the <br />backwater valve. <br />2) Complete corrections left on 12-20-18 <br />inspection. <br />Phone: 406-390-3676 <br />(1/14/2019 2:14 PM DWF) <br />Exterior only, ok to cover <br />call for electrical and <br />mechanical inspe <br />406-390-3676 <br />406-390-3676 <br />(9/27/2019 3:25 PM KMK) <br />Add full blocking between floor joists at <br />bearing points. <br />INSP12 <br />CfMS �, S 77'tLF.5 •�.Ci <br />
The URL can be used to link to this page
Your browser does not support the video tag.