Laserfiche WebLink
'UBLIORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2nd Floor <br />Everett, WA 98201 <br />(425) 257-8810 <br />Wate Applied: <br />Public Works Permit #: <br />Associated Bldg Permit #: <br />Planning Reference #: <br />Public Works Fee: <br />' 1_ o <br />6/18/2018 <br />PW1806-027 <br />B1802-003, 004, 005 <br />$135.00 <br />JUL 2018 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />CLM PROPERTY SOLUTIONS LLC <br />CLM PROPERTY SOLUTIONS LLC <br />14751 N KELSEY ST UNIT 105 183 <br />14751 N KELSEY ST UNIT 105 183 <br />MONROE, WA, 98272 <br />MONROE, WA, 98272 <br />PHONE: 4063903676 <br />PHONE: 4063903676 <br />TAX PARCEL ID #: 00451402402600 <br />SITE ADDRESS: 3714 COLBY AVE <br />DESCRIPTION: SITE WORK FOR TOWNHOME REMODEL <br />EXISTING BUILDING BEING CONVERTED INTO 3 TOWNHOMES. THIS PERMIT COVERS SITE WORK ASSOCIATED <br />WITH THIS CONVERSION. <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards <br />and Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 6/18/2018. <br />Approved plans must remain on job -site at all times. <br />5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br />consultation, to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested. See the attached <br />handout for phone number and online instructions to Request an Inspection. <br />6. Install and maintain erosion control measures per City of Everett Standards and and as directed by the PW Inspector. <br />Remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br />managed on -site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br />easements and the improvements located therein. <br />10. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Contact the <br />Planning Department at 425-257-8731 to schedule the inspection. <br />11. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection line to <br />request a Final for this permit when all items have been completed. <br />Public Works Permit Fee Breakdown: , <br />Paving(1756SF).....................................$45.00�� <br />Erosion Control.......................................$50.00 JUL o 2K <br />PW Plan Review.....................................$20.00 <br />PW Site Inspection.................................$20.00 CITY OF EVERETT <br />City of EverettOlfCial Use Only ACKNOWLEDGEMEN�tr�TtMb1'i6w <br />The undersigned owner/applicant hereby agrees to hold and save <br />harmless the City of Everett from any and all claims for damages, costs, <br />1Ile�!expenses, or causes of action that may arise because of installation and <br />v <br />maintenance of the improvement or other right-of-way use here to applied <br />Approved for Construction (Public Works) Dates for and further agrees remove same upon notice from the City and to <br />replace lic dama <br />FINAL INSPECTION Date <br />Approved as Constructed (PW Inspector) Ignatur of icant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETEION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />' !t <br />