Laserfiche WebLink
PUBLIC WORKS PERMIT <br />EVE RETT <br />WASHINGTON <br />City of Everett Permit Services <br />3200 Cedar Street, 2"d Floor <br />Everett, WA 98201 <br />425-257-8810 <br />Date Applied: 5/10/2013 <br />Public Works Permit #: PW1305-005 <br />Associated Bldg Permit #: <br />Planning Reference #: <br />Public Works Fee: $25 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />JASON CIHAK <br />OWNER <br />3825 COLBY AVE <br />coply <br />EVERETT, WA, 98201 <br />, <br />PHONE: 4253271120 <br />PHONE: <br />TAX PARCEL ID #: <br />SITE ADDRESS: 3825 COLBY AVE <br />DESCRIPTION: FENCE <br />(5/10/2013 3:25 PM BES) <br />BUILD A FENCE IN THE FRONT AND SIDE OF PROPERTY <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications <br />for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. MAKE SURE THE FENCE IS NO HIGHER THAN 42" IN <br />THE FRONT AND UP TO 20' BACK FROM THE FRONT PROPERTY LINE. AFTER THE 20' SETBACK THE FENCE COULD GO AS HIGH AS 6'. <br />5. CALL THE CITY INSPECTOR RANDY ALLEN PRIOR TO STARTING WORK 425-339-7403 <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant <br />hereby agrees to hold and save harmless the City of Everett from any <br />and all claims for damages, costs, expenses, or causes of action that <br />may arise because of installation and maintenance of the <br />improvement or other right-of-way use here to applied for and further <br />agrees to remove same upon notice from the City and to replace <br />Approved for Construction, Public Works Dept. Date public property damaged thereby. <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAYBE CANCELLED BY THE <br />CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />