Laserfiche WebLink
8/ 17/2021 City of Everett <br />7:51:19AM <br />INSPECTION ACTIVITY REPORT <br />7/7/2021 7/7/2021 PLUMB TAHU APPROVAL see notes <br />03-ROUGH IN <br />7/13/2021 7/13/2021 PLUMB TAHU <br />03-ROUGH IN <br />8/3/2021 8/3/2021 PLUMB 07-FINAL TAHU <br />8/5/2021 8/5/2021 <br />VIOLATION -HOLD CRB <br />RELEASE <br />OTHER inspection not <br />needed <br />APPRVD-PERK eTRAKiT Inspection <br />Request <br />OTHER BLDG PERMIT <br />ISSUED <br />Page 1 <br />2 <br />7/l/2021 2:07 PM Taylor Nelson <br />Contact Name: Taylor Nelson <br />Site Address: 4809 COLBY AVE <br />Phone:4253082731 <br />e-Mail: Taylornelson95@gmail.com <br />(7/7/2021 11:48 AM TAHU) <br />Rough in ok, <br />Note Shower down stairs is going to be a <br />rough in only for now. Qwner is put <br />shower install later. <br />Owner change his mind, and is going to <br />install the shower down strairs TAH <br />8/3/21. <br />7/12/2021 1:13 PM Taylor Nelson <br />Need the mechanical rough in signed off in <br />the downstairs bathroom and hood vent. <br />See note <br />Contact Name: Taylor Nelson <br />Site Address: 4809 COLBY AVE <br />Phone:4253082731 <br />e-Mail: Taylornelson95@gmail.co <br />8/2/2021 9:36 PM Taylor Nelson <br />Contact Name: Taylor Nelson <br />Site Address: 4809 COLBY AVE <br />Phone:4253082731 <br />e-Mail: Taylornelson95@gmail.com <br />(8/3/2021 9:42 AM TAHU) <br />Final ok <br />INSP12 COWSYSTEMS <br />