Laserfiche WebLink
11 <br />2020 System Development Fee Calculations <br />Permit #: PW2007-018 <br />Additional Notes: <br />Project Address: 6815 COLBY AVE <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: NEW DETACHED GARAGE AND PAVING <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: Thad Newport Date: 7/10/2020 <br />Outside City Limits? No *Adds a 25% Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: Type of Construction: Existing Development Adding <br />New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: Xttf-M Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />-�,w Z,,'-7'�4a re Feet of New Plus Replaced Hard Surfaces: 1,0311 SF <br />Stormwater System Dev Fee: I $263.83 JAdd this fee to the Public Works Permit for hard surfaces on the ground. <br />