My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7818 LARIMER RD B 2022-02-18
>
Address Records
>
LARIMER RD
>
7818
>
7818 LARIMER RD B 2022-02-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 10:08:02 AM
Creation date
10/14/2021 2:49:12 PM
Metadata
Fields
Template:
Address Document
Street Name
LARIMER RD
Street Number
7818
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 0 <br />2019 System Development Fee Calculations <br />Permit#: C1906-010 <br />Additional Notes: <br />Project Address: 7818 Latimer RD <br />Project Name: NEW ADU <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />at <br />Sewer District: Everett <br />Prepared By: Date: <br />Outside City Limits? JNo *Adds a 25%Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />d d <br />Reviewed By: Date: -1 116 � <br />Fee Calculations: <br />Water & Sewer System Development Fees: <br />Domestic Meter: Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />*Subject to Administrative Guidelines Proposed Building Use: SFR/Townhome Previous Bldg Use #1: No Other Usel Previous Bldg Use #2: No Other Use <br />Previous Bldg Use #3: <br />No Other Use <br />ProposeclUnit Measure: <br />1 Unit Unit Measure for Use #1: None Unit Measure for Use #2: None <br />Unit Measure for Use #3: <br />None <br />Note: Meter Size Used for Proposed Meter Size: <br />None Credited Meter #1 Size: None Credited Meter #2 Size: None <br />Credited Meter #3 Size: <br />None <br />Calculation Water Fee: <br />$0.00 Water Credit #1: $0.00 Water Credit #2: $0.00 <br />Water Credit #3: <br />$0.00 <br />Sewer Fee: <br />$0.00 Sewer Credit #1: $0.00 Sewer Credit #2: $0.00 <br />Sewer Credit #3: <br />$0.00 <br />Total Fees Due: Add to Utility Permit for Domestic Meter <br />Permit M U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Sewer Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Total: <br />$0.00 <br />Irrigation Meter: Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />None Credited Meter Size: None <br />Water Fee: <br />$0.00 Water Credit: $0.00 <br />No Sewer Fee: <br />$0.00 No Sewer Credit: $0.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: <br />$0.00 <br />llrrigation meters are only subject to the water portion of system development fees <br />Total: <br />$0.00 <br />Fire Meter: Proposed Meter Size: <br />None <br />Forinforma6onal purposes only <br />Permit #: U No Sys Dev Fees: <br />$0.00 <br />Fire meters are not subject to system development fees <br />Stormwa er System Development Fees: <br />Permit#: C_ICl C>lo—at0 Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />1,200 SF <br />Stormwater System Dev Fee: $298.44 Add this fee to the Building Permit (or Public Works Permit if there is no building permit for the project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.