Laserfiche WebLink
locations, changes from that described in this report, our recommendations should also be <br />reviewed and revised by AGS. <br />Our Scope of Work for this project did not include any assessment of any kind of any existing <br />structures. Our scope of work did not include research, testing, or assessment relative to past or <br />present contamination of the site by any source. If such contamination were present, it is very <br />likely that the exploration and testing conducted for this report would not reveal its existence. If <br />the Owner is concerned about the potential for such contamination, additional studies should be <br />undertaken. We are available to discuss the scope of such studies with you. No tests were <br />performed to detect the existence of mold or other environmental hazards as it was beyond Scope <br />of Work. <br />Local regulations regarding land or facility use, on and off -site conditions, or other factors may <br />change over time, and additional work may be required with the passage of time. Based on the <br />intended use of the report within one year from the date of report preparation, AGS may <br />recommend additional work and report updates. Non-compliance with any of these requirements <br />by the client or anyone else will release AGS from any liability resulting from the use of this report <br />by any unauthorized party. Client agrees to defend, indemnify, and hold harmless AGS from any <br />claim or liability associated with such unauthorized use or non-compliance. <br />In this report, we have presented judgments based partly on our understanding of the proposed <br />construction and partly on the data we have obtained. This report meets professional standards <br />expected for reports of this type in this area. Our company is not responsible for the conclusions, <br />opinions or recommendations made by others based on the data we have presented. Refer to <br />American Society of Foundation Engineers (ASFE) general conditions included in an appendix. <br />This report has been prepared exclusively for the client, its' engineers and subcontractors for <br />design and construction of the proposed structure. No other engineer, consultant, or contractor <br />shall be entitled to rely on information, conclusions or recommendations presented in this <br />document without the prior written approval of AGS. <br />Proposed Construction <br />Project No: 0470-WA18 <br />January 24, 2019 <br />Page No: 16 of 17 <br />