My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD 2023-01-30
>
Address Records
>
RIVERSIDE RD
>
405
>
405 RIVERSIDE RD 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 12:03:59 PM
Creation date
10/14/2021 5:14:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 System Development Fee Calculations <br />Permit #: <br />PW1801-027 / B1801-018 <br />Additional Notes: <br />Project Address: <br />405 Riverside Rd <br />Warehouse with 82215sf. Will need to reevaluate with T.I. permit if it changes to manufacturing use. <br />Project Name: <br />Latitude Phase 2/ Lot 4 (Tilt up shell warehouse/manufacturing) <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: <br />Everett <br />Sewer District: <br />Everett <br />Prepared By: Sabrina Fandler Date: 3/18/2020 <br />Outside City Limits? <br />No *Adds a 25%Surcharge <br />Supportive Housing Credit? <br />No *Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />/ <br />Water & Sewer System Development <br />Fees: /f <br />Domestic Meter: <br />*subject to administrative Guidelines <br />Fee Calculate, (Before Credit). Credit Calculations (Up to 3 meters for Meter -Based Calculation or previous building uses for Administrative Guidelines -Based Calculation): <br />Proposed B Idling Use: Warehouse Previous Bldg Use #1: No Other Use Previous Bldg Use #2: No Other Use <br />Previous Bldg Use #3:1 <br />No Other Use <br />Proposed it Measure: 82,215 Sq. Ft. Unit Measure for Use #1: None Unit Measure for Use #2:1 None <br />Unit Measure for Use #3: <br />- None <br />Note: Meter size Used for <br />roposed Meter Size: 2" Credited Meter #1 Size: None Credited Meter #2 Size: None <br />Credited Meter #3 Size: <br />None <br />Calculation <br />Water Fee: $21,702.00 Water Credit #1: $0.00 Water Credit #2: $0.00 <br />Water Credit #3: <br />$'- - <br />Sewer Fee: $28,086.00 Sewer Credit #1: Sewer Credit #2: $0.00 <br />Sewer Credit #3: <br />$0.00 <br />TotallFees Due: Add to Utility Permit for Domestic Meter <br />Q <br />Permit #: U V O� r Ob <br />'water Sys Dev Fee Total: <br />$21,702.00 <br />This fee reflects credit for existing water meter <br />Sewer Sys Dev Fee Total: <br />$28,086.00 <br />This fee reflects credit for existing water meter <br />Total: $49,788.00 <br />Irrigation Meter: <br />Fee Calc ation(Be foreCredit): Credit Calculations: <br />Proposed Meter Size: 1" Credited Meter Size: None <br />Water Fee: $6,800.00 Water Credit: $0.00 <br />No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br />Tota Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U '00 <br />ter Sys Dev Fee Total: <br />$6,800.00 <br />This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: <br />$0.00 <br />llrrigotion meters are only subject to the water portion of system development fees <br />Total: $6,800.00 <br />Fire Meter: <br />Proposed Meter Size: <br />None <br />I For informational purposes only <br />Permit #: U <br />No Sys Dev Fees: <br />$0.00 <br />Fire meters are not subject to system development fees <br />Stormw r System DevelopmFees: <br />Permit #: r V� <br />Type of Construction: New Construction/Redevelopment <br />Square Feet of New <br />lus Replaced Hard Surfaces: 184,472 SF <br />Stormwater System Dev Fee: $47,206.63 Add this fee to the Building Permit (or Public Works Permit if there is no building permit for the project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.