Laserfiche WebLink
Construction Stormwater General Permit <br /> I Stormwater Pollution Prevention Plan <br /> I <br /> (SWPPP) <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> II <br /> 1 <br /> I <br /> I <br /> I <br /> for <br /> Riverside Business Park— Phase 2 <br /> Prepared for: <br /> The Washington State Department of Ecology <br /> Northwest Regional Office <br /> Permittee/ Owner Developer Operator/ Contractor <br /> Latitude Development LLC Latitude Development LLC Team Nelson, Inc. <br /> 625 Riverside Road, Everett WA, 98201 <br /> Certified Erosion and Sediment Control Lead (CESCL) <br /> Name Organization Contact Phone Number <br /> TBD TBD TBD <br /> I <br /> SWPPP Prepared By <br /> Name Organization Contact Phone Number <br /> Sam Turman The Blueline Group 425-250-7255 <br /> SWPPP Preparation Date <br /> 1/05/2018 <br /> Project Construction Dates <br /> Activity/ Phase Start Date End Date <br /> Clearing /Start 03/18 03/19 <br />