My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD 2023-01-30
>
Address Records
>
RIVERSIDE RD
>
405
>
405 RIVERSIDE RD 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 12:03:59 PM
Creation date
10/14/2021 5:14:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicable B. <br /> MPs:Spill prevention measures, such as drip pans, will be used when conducting <br /> maintenance and repair of vehicles or equipment. <br /> • In order to perform emergency repairs on site, temporary plastic will be placed <br /> beneath and, if raining, over the vehicle. <br /> • Contaminated surfaces shall be cleaned immediately following any discharge or <br /> spill incident. <br /> • Material Delivery, Storage and Containment (BMP C153) <br /> Fuel onsite will be comprised of fuel tanks in operating equipment ranging between 50-100 <br /> gallons of off road diesel fuel. The BMPs listed below as well as procedures described above <br /> should be followed with refueling equipment. Spill kits should be kept on hand and accessible <br /> during refueling activates. <br /> Installation Schedules: Start of project and replaced as needed and at start of wet season. <br /> Inspection and Maintenance plan: Responsible staff to make weekly site walks and inspections <br /> to identify deficiencies in onsite BMPs and anticipate potential problems and remedies. <br /> Responsible Staff: Identified Certified Erosion and Sediment Control Lead in Section 3 of this <br /> SWPPP. <br /> Will wheel wash or tire bath system BMPs be used during construction? <br /> ❑ Yes® No <br /> Will pH-modifying sources be present on-site? <br /> ® Yes❑ No <br /> Table 3— pH-Modifying Sources <br /> ❑ None <br /> ❑ Bulk cement <br /> ❑ Cement kiln dust <br /> ❑ Fly ash <br /> ® Other cementitious materials <br /> ❑ New concrete washing or curing waters <br /> ❑ Waste streams generated from concrete grinding and sawing <br /> ❑ Exposed aggregate processes <br /> ❑ Dewatering concrete vaults <br /> ❑ Concrete pumping and mixer washout waters <br /> ❑ Recycled concrete <br /> ❑ Recycled concrete stockpiles <br /> ❑ Other(i.e., calcium lignosulfate) [please describe] <br /> Page 117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.