My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD 2023-01-30
>
Address Records
>
RIVERSIDE RD
>
405
>
405 RIVERSIDE RD 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 12:03:59 PM
Creation date
10/14/2021 5:14:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.12 Element 12: Manage the Project <br /> The project will be managed based on the following principles: <br /> I • Projects will be phased to the maximum extent practicable and seasonal work limitations <br /> will be taken into account. <br /> I • Inspection and monitoring: <br /> o Inspection, maintenance and repair of all BMPs will occur as needed to ensure <br /> I performance of their intended function. <br /> o Site inspections and monitoringwill be conducted in accordance with Special <br /> P P <br /> Condition S4 of the CSWGP. Sampling locations are indicated on the Site Map. <br /> I Sampling station(s) are located in accordance with applicable requirements of <br /> the CSWGP. <br /> • Maintain an updated SWPPP. <br /> Io The SWPPP will be updated, maintained, and implemented in accordance with <br /> Special Conditions S3, S4, and S9 of the CSWGP. <br /> IAs site work progresses the SWPPP will be modified routinely to reflect changing site <br /> conditions. The SWPPP will be reviewed monthly to ensure the content is current. <br /> ICheck all the management BMPs that apply at your site: <br /> Table 5 — Management <br /> I ® Design the project to fit the existing topography, soils, and drainage patterns <br /> Emphasize erosion control rather than sediment control <br /> I ® Minimize the extent and duration of the area exposed <br /> ® Keep runoff velocities low <br /> n Retain sediment on-site <br /> I ® Thoroughly monitor site and maintain all ESC measures <br /> Schedule major earthwork duringthe dryseason <br /> n Other (please describe) <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Page I21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.