Laserfiche WebLink
• Keeping daily logs, and inspection reports. Inspection reports should <br /> include: <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> •Inspection date/time. <br /> •Weather information; general conditions during inspection and <br /> approximate amount of precipitation since the last inspection. <br /> •A summary or list of all BMPs implemented, including <br /> observations of all erosion/sediment control structures or <br /> practices. The following shall be noted: <br /> 1) Locations of BMPs inspected, <br /> 2) Locations of BMPs that need maintenance, <br /> 3) Locations of BMPs that failed to operate as designed or <br /> intended, and <br /> 4) Locations of where additional or different BMPs are <br /> required. <br /> •Visual monitoring results, including a description of discharged <br /> stormwater. The presence of suspended sediment, turbid <br /> water, discoloration, and oil sheen shall be noted, as applicable. <br /> •Any water quality monitoring performed during inspection. <br /> •General comments and notes, including a brief description of any <br /> BMP repairs,maintenance or installations made as a result of <br /> the inspection. <br /> • Facilitate,participate in, and take corrective actions resulting from <br /> inspections performed by outside agencies or the owner. <br /> 4-48 Volume ll—Construction Stormwater Pollution Prevention February 2005 <br />