My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD 2023-01-30
>
Address Records
>
RIVERSIDE RD
>
405
>
405 RIVERSIDE RD 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 12:03:59 PM
Creation date
10/14/2021 5:14:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:, <br /> Horizontal Spacing of Interceptor Dikes: <br /> Average Slope Slope Percent Flowpath Length <br /> 20H:1 V or less 3-5% 300 feet <br /> (10 to 20)H:1 V 5-10% 200 feet <br /> (4 to 10)H:1 V 10-25% 100 feet <br /> (2 to 4)H:1 V 25-50% 50 feet <br /> Stabilization depends on velocity and reach <br /> Slopes<5% Seed and mulch applied within 5 days of dike <br /> construction(see BMP C121, Mulching). <br /> Slopes 5 -40% Dependent on runoff velocities and dike materials. <br /> Stabilization should be done immediately using either <br /> sod or riprap or other measures to avoid erosion. <br /> • The upslope side of the dike shall provide positive drainage to the dike <br /> outlet. No erosion shall occur at the outlet. Provide energy dissipation <br /> measures as necessary. Sediment-laden runoff must be released <br /> through a sediment trapping facility. <br /> • Minimize construction traffic over temporary dikes. Use temporary <br /> cross culverts for channel crossing. <br /> Interceptor swales shall meet the following criteria: <br /> Bottom Width 2 feet minimum; the bottom shall be level. <br /> I <br /> I <br /> I <br /> Depth 1-foot minimum. <br /> ISide Slope 2:1 or flatter. <br /> Grade Maximum 5 percent, with positive drainage to a <br /> I suitable outlet (such as a sediment pond). <br /> Stabilization Seed as per BMP C120, Temporary and Permanent <br /> Seeding, or BMP C202, Channel Lining, 12 inches <br /> I thick of riprap pressed into the bank and extending <br /> at least 8 inches vertical from the bottom. <br /> • Inspect diversion dikes and interceptor swales once a week and after <br /> I every rainfall. Immediately remove sediment from the flow area. <br /> • Damage caused by construction traffic or other activity must be <br /> repaired before the end of each working day. <br /> ICheck outlets and make timely repairs as needed to avoid gully formation. When <br /> the area below the temporary diversion dike is permanently stabilized,remove the <br /> dike and fill and stabilize the channel to blend with the natural surface. <br /> I <br /> I <br /> I <br /> 4-58 Volume ll—Construction Stormwater Pollution Prevention February 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.