My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD Geotech Report 2022-10-25
>
Address Records
>
RIVERSIDE RD
>
405
>
Geotech Report
>
405 RIVERSIDE RD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:56:24 PM
Creation date
10/14/2021 5:19:00 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnicai Report <br />Riverside Business Park, Lots 2 and 4 <br />Riverside Road <br />Everett, Washington <br />1.0 PROJECT DESCRIPTION <br />The project consists of developing Lots 2 and 4 comprising approximately 11 acres of land at the Riverside <br />Business Park in Everett, Washington. Sheet GP-01, dated November 16, 2016 prepared by The Blueline Group <br />indicates development will include construction of two industrial buildings with associated infrastructure <br />improvements. Buildings A and B will have footprint areas of 98,000 and 110,700 square feet, respectively. <br />Each of the buildings will have their floors constructed at Elev. 20.25. Loading docks are planned at the south <br />side of Building A and the east side of Building B. <br />We expect the building will be constructed using precast concrete tilt up wall panels with interior isolated <br />columns supporting the roof framing. We anticipate structural loading will be light, with columns carrying 100 <br />to 150 kips and continuous bearing walls carrying 4 to 6 kips per lineal foot. Product loading on the floor slab is <br />not expected to exceed 350 pounds per square foot. <br />The recommendations contained in the following sections of this report are based on the above design features. <br />We should review any changes in the geotechnical aspects of the design plans as they are developed to verify that <br />our recommendations are valid for the proposed construction and to amend or modify our report, as necessary. <br />2.0 SCOPE OF WORK <br />Our scope of work was completed in general accordance with our authorized proposal dated October 25, 2016. <br />On November 21 and 22, 2016, six Cone Penetration Tests (CPTs) were advanced at the site to depths of 60 and <br />60.5 feet. Using the information obtained from our subsurface exploration, we performed analyses to develop <br />geotechnical engineering recommendations for project design and construction. <br />Specifically, this report addresses the following: <br />• Soil and groundwater conditions <br />• Seismic <br />• Site preparation and grading including recommendations for building preload or surcharge to mitigate <br />floor and foundation settlement. <br />• Foundations <br />• Floor slabs <br />• Lateral earth pressures for wall design <br />• Subsurface drainage <br />• Utilities <br />• Pavements <br />
The URL can be used to link to this page
Your browser does not support the video tag.