My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2022-05-13
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
ADMIN BLDG WEST
>
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:40:58 AM
Creation date
10/15/2021 9:33:59 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
ADMIN BLDG WEST
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX: SUPPLEMENTAL PROJECT NARRATIVE <br />(narrative excerpt from SPU 17-007's application package) <br />Project will involve the construction of a new approximately 30,000 square foot entry tower <br />(five stories plus partial basement) attached to the north side of the existing 1967 Snohomish <br />County Courthouse, and renovation of approximately 54,000 square feet within the existing <br />courthouse. <br />A. New Addition: The footprint of the new addition will comprise approximately 5,900 square <br />feet and be placed over the existing entry plaza located between the north entrance of the <br />courthouse and Wall Street as shown in the site plan. It will connect to, and provide seismic <br />reinforcement for, the existing Courthouse via public circulation corridors as more fully <br />depicted in the schematic floor plans (attached to the SEPA Checklist as Exhibits 3a through 3f), <br />with a code -mandated fire -door and 3-hour firewall separation maintained at the connection <br />on all levels. <br />The new entry tower will be utilized to provide expanded security screening, public circulation <br />and access corridors serving the existing courthouse structure including a new stairwell access <br />and two new elevators for general public access. The existing public elevators internal to the <br />existing courthouse will be replaced with a single secured elevator for staff access. The current <br />inmate -circulation elevator internal to the existing courthouse will remain in service but court <br />facilities on the east end of the courthouse will be reconfigured to allow for secure inmate <br />transfer between the elevator corridor and adjacent courtrooms. In addition, various services <br />and facilities within the existing courthouse structure are proposed to be relocated or <br />consolidated within the new entry tower as follows: <br />• Level 1— Lobby with expanded security screening area (replaces existing security <br />screening currently conducted in first floor hallway); <br />• Level 2 —Jury Assembly room (relocated from first floor of existing courthouse; criminal <br />hearings courtroom currently located on third floor will be relocated to vacated space <br />on first floor); <br />• Level 3 — District court administration will be consolidated into Level 3 of the new entry <br />tower (district court hearings room will be relocated to space vacated by the district <br />court administration and district court courtrooms relocated to space vacated by <br />criminal hearings courtroom so that all district court services and courtrooms are <br />located on the same floor); <br />• Level 4— Consolidation of existing Sheriff's Office Administration and New Superior <br />Court Trial Courtroom and related staff offices for existing judicial seat currently <br />designated as "roving" (Snohomish County Superior Court consists of fifteen elected <br />superior court judges, two of whom rotate to the Denny Juvenile Justice Center, leaving <br />Snohomish County I Narrative for Special Property Use Application to City of Everett <br />
The URL can be used to link to this page
Your browser does not support the video tag.