Laserfiche WebLink
APPENDIX: SUPPLEMENTAL PROJECT NARRATIVE <br />(narrative excerpt from SPU 17-007's application package) <br />Project will involve the construction of a new approximately 30,000 square foot entry tower <br />(five stories plus partial basement) attached to the north side of the existing 1967 Snohomish <br />County Courthouse, and renovation of approximately 54,000 square feet within the existing <br />courthouse. <br />A. New Addition: The footprint of the new addition will comprise approximately 5,900 square <br />feet and be placed over the existing entry plaza located between the north entrance of the <br />courthouse and Wall Street as shown in the site plan. It will connect to, and provide seismic <br />reinforcement for, the existing Courthouse via public circulation corridors as more fully <br />depicted in the schematic floor plans (attached to the SEPA Checklist as Exhibits 3a through 3f), <br />with a code -mandated fire -door and 3-hour firewall separation maintained at the connection <br />on all levels. <br />The new entry tower will be utilized to provide expanded security screening, public circulation <br />and access corridors serving the existing courthouse structure including a new stairwell access <br />and two new elevators for general public access. The existing public elevators internal to the <br />existing courthouse will be replaced with a single secured elevator for staff access. The current <br />inmate -circulation elevator internal to the existing courthouse will remain in service but court <br />facilities on the east end of the courthouse will be reconfigured to allow for secure inmate <br />transfer between the elevator corridor and adjacent courtrooms. In addition, various services <br />and facilities within the existing courthouse structure are proposed to be relocated or <br />consolidated within the new entry tower as follows: <br />• Level 1— Lobby with expanded security screening area (replaces existing security <br />screening currently conducted in first floor hallway); <br />• Level 2 —Jury Assembly room (relocated from first floor of existing courthouse; criminal <br />hearings courtroom currently located on third floor will be relocated to vacated space <br />on first floor); <br />• Level 3 — District court administration will be consolidated into Level 3 of the new entry <br />tower (district court hearings room will be relocated to space vacated by the district <br />court administration and district court courtrooms relocated to space vacated by <br />criminal hearings courtroom so that all district court services and courtrooms are <br />located on the same floor); <br />• Level 4— Consolidation of existing Sheriff's Office Administration and New Superior <br />Court Trial Courtroom and related staff offices for existing judicial seat currently <br />designated as "roving" (Snohomish County Superior Court consists of fifteen elected <br />superior court judges, two of whom rotate to the Denny Juvenile Justice Center, leaving <br />Snohomish County I Narrative for Special Property Use Application to City of Everett <br />