Mr. Bob Egleston <br />Apgust 2, 2018 <br />Page 5�F <br />Structure Comment MKA Response <br />26. The comment asked for clarification that <br />different floor weights representing the new <br />and existing construction have been used. <br />Identify where the calculations verify these <br />weights. <br />27. This comment does not appear to be <br />addressed by the submitted calculations as <br />indicated. Please specify the pertinent <br />calculation pages. <br />28. This comment does not appear to be <br />addressed by the submitted calculations as <br />indicated. The plans do not appear to <br />include a structural element developing the <br />new building chord into the existing <br />diaphragm at Grid F/13. <br />This comment does not appear to be <br />addressed by the submitted calculations as <br />indicated. Please specify the pertinent <br />calculation pages. <br />MAGNUSSON <br />KLEMENCIC <br />ASSOCIATES <br />The various structural system weights noted on <br />pages 4014-4021 of the previously submitted <br />calculations are divided by the gravitational <br />constant 32.2 ft/s2 to determine the applied floor <br />mass input in ETABS. <br />Refer to Section 5 (PDF page 178-184) of the <br />previously submitted calculations. Collector and <br />chord forces were all increased by 1.25. Please <br />note that in the calculations, this 1.25 factor was <br />mistakenly called rho and was either applied to <br />the demand force or required minimum area for <br />each condition. <br />Refer to section 5 of the previously submitted <br />calculations (PDF page 176 & lower half of page <br />184). The total chord force to be developed is <br />small (30k). The (2) #6 chord bars along grid <br />12.1 are hooked into the Grid F shear wall. The <br />existing columns and C10 perimeter beam in the <br />existing building all are connected into the new <br />grid F shear wall with headed studs. See details <br />6 & 10/S-603 to see load path. The existing N-S <br />W16 beams are moment connected into the <br />columns which by inspection adequately <br />develops the demand chord force from the <br />building addition into the existing building. The <br />existing C 10 channels are also directly connected <br />to the existing diaphragm via new collector plates <br />(see details 10/S-601 & 13/S-601) which <br />provides additional redundancy for developing <br />the small chord force from the building addition. <br />Due to the notch in the southwest corner of the <br />addition slab, additional reinforcement was <br />added to adequately develop the chord <br />reinforcement into the grid F shear wall and <br />existing connected elements. See sheet S-261 for <br />revised diaphragm reinforcement plans. <br />Requested calculation is included in attached <br />supplemental calculations. <br />