g
<br />io
<br />M
<br />C14
<br />4�
<br />cr)
<br />1.4
<br />��Imm ffljo-t 24" CPP IE 406,09 �
<br />SDMH #1586 RIM 420.49 24" CONC IE 406.04 NW 1/4, SW 1/4, SEC 1, TWP 28N, RGE 4E, W.M.
<br />RIM 418.66 8" PVC IE 400�33 (W & S)
<br />8" PVC 11E 400�23 (E) N 0 FU R TH ER -
<br />24" CPP IE 406�98 (E) PAINT SOUTH RnTTOM STRUCT = 40Z00
<br />SqMH #1585 -'sov G
<br />24" CPP IE 406.91 (W) (REFER TO NOTE) SDMH #1690 CALCULATED BASED ON
<br />�9 RIM 4-119.99 7, ro.000 W T- 1 LID )rA AQDI III T r)DA1A/IK4P�Z**
<br />TBM lo, ul-t- it 8" PV%C IE 400.77 (W & s)-,\ I r RIM 42Z27
<br />I
<br />NO FURTHER LA
<br />EL 418.34"
<br />PAINT SOUTH 8" PVC RE 400,67 (E) 12" CPP IE 418.29 (W)
<br />CTR CHANNEL 400.7772 N12" CPP IE 41514 tN)
<br />(REFER TO NOTE)
<br />m 12" `PP IE 415� 04 (S)
<br />Ile 't, - U
<br />B
<br />C6 #1371
<br />IM 422.15
<br />QA
<br />INDUSMY ST 0 1 �___ , I - >_" z I) -RI
<br />12" CPP IE 418.47 (E)
<br />I T8m '13,
<br />SEE PMES IAN ACCESS -NOTE---,
<br />SS 423.22'
<br />0--
<br />FOUND 5/8" REBAR W/ CAP, 'RM
<br />37527% 0.5' BELOW GRADE� (11/29/18)
<br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
<br />T7722u�
<br />420 5
<br />424
<br />ZD D fEMPORARY UTILITY
<br />EASEMENT PER REC.
<br />mm
<br />N
<br />"A
<br />CARS
<br />�==o
<br />1 0"A v #199907150047
<br />0"COT
<br />#199907155001.
<br />m IER
<br />mmm
<br />D 4 BLE
<br />SDMH #1448 W/ T-1 GRATE
<br />IM 42Z96
<br />R
<br />N
<br />-A- 4 -Vl 2" CPP IE 417.61 (W)
<br />5" CPP IE 416.73 (S)
<br />p
<br />0 L*
<br />7
<br />5" CPP iE 416�26 (N)
<br />7�
<br />V"�
<br />15�O'W OF LI I,4E.
<br />SSMH #1373
<br />RIM 423.41
<br />7
<br />CULV pp
<br />71 7�
<br />18"C N
<br />7, CB%�2372
<br />1� L� z 8" PVC IE 400.31 (S)
<br />L
<br />RIM 95 V
<br />T,,M D plpt7 IE 413.9
<br />P C IE 400,31 (E)
<br />b I ANU t-irL
<br />2, vv 8" PVC IE 400.21 (N)
<br />12"'fPP IE 418.21� (E) kp
<br />ULV 18"ADS NE OP 420.90'
<br />J CENTER CHANNEL 400.26
<br />s i. � - i�_ ,
<br />bc
<br />4
<br />2
<br />x\
<br />IE 419.59'
<br />k��, r-
<br />t -v UTILITY EAVEMENT
<br />CULV 18"ADS S
<br />'R BSP
<br />_y
<br />k_-.8 C 05011015A
<br />0 T
<br />""s
<br />R
<br />I E 418.9 If
<br />0
<br />0
<br />10.0' UTILITY EASEMENT PER BSP REG
<br />00 t
<br />#2005501105159
<br />Ar X
<br />00
<br />-.4 W,
<br />�2' IN, 2r' 0' HI H VOLTAGE EASEMENT PER REC
<br />#200512280808
<br />7, e,\
<br />V
<br />J
<br />TEMPORARY UTILITY
<br />0
<br />CB #1379
<br />0 N,
<br />EASEMENT PER REC.
<br />RIM 423.54
<br />#19990 7155001
<br />12" CPP 1E 421.16 (E)
<br />CY)
<br />'0 �1_
<br />T
<br />SDM\H #1447
<br />ED AREA. 74,923 SQ, FT. AREA: 114,387 SQ. FT.
<br />N
<br />Lj
<br />04 �W/ T-1 GRATE
<br />Lij
<br />RIM 424�80
<br />CL
<br />19" CPP IE 419.01 (W)
<br />z FOUND 5 15" CPP IE 417.61 (S)
<br />0 /8" BARE REBtR
<br />1z (11 /29/113) �x 15" CPP IE 417�56 (N)
<br />__4
<br />r
<br />E3 IN,
<br />7� v
<br />vr,
<br />R"
<br />x
<br />0?
<br />77 "Z�,:.
<br />R=370-0""'
<br />L=154.40'
<br />4
<br />SSNIH #1378
<br />RIM 424.58
<br />fill �x
<br />AA
<br />8" PVC 1E 40t97 (S)
<br />S
<br />iir m ji�
<br />3" PVC 1E 401.87 (N)
<br />A 4211- - -
<br />CENTER CHANNEL 401.92
<br />C
<br />9
<br />\+
<br />L=1 41 8'��
<br />jo - RIM 424.21
<br />R
<br />D& #1377
<br />340.00 t�
<br />36" CONC IE 413.91 (S)
<br />2"
<br />T., A-- 2 3 5 4'3 1
<br />36" CONC IE 41311 (N)
<br />N",
<br />4,7
<br />S�
<br />VAULT F
<br />r
<br />VN
<br />0
<br />n,
<br />Z__
<br />n
<br />FOUND 5/8" BARE REBAR,
<br />15�0'w 29 1 N
<br />BENTSOUTH
<br />g
<br />REBAR
<br />N
<br />(11/29/18)
<br />37527', FOUND 5/8" REBAR'..
<br />GRADE W/ CAP, 'RM 37527%,-
<br />, 1 ) - 432----- 0$
<br />�15� PTILITY -,�SSEMENT PE1�-REC-#2-_0641228_042ftUSH W1 GRAD� "I 4'56"E W
<br />/29/18) W __�@ e)
<br />I a - " '; IV—
<br />BSP #200501105159 4Q09 C3
<br />4�3�2_ - - C
<br />A)
<br />12"_ W 3 .0
<br />"C�" 51 =4 .2___ -
<br />tG 1 4"C 0
<br />Ar C7- 17-C 'r _1 8 T01111C`___1
<br />z
<br />z,
<br />7
<br />lop$
<br />GATE- 14$1 1 11C 4"C 12"C
<br />9. 0' S OF LINE 10.0, S OF LINE 12�2' S OF LINE (n
<br />15' CLFN C
<br />LEGEND
<br />CONSTRUCTION ACCESS
<br />REMOVE ASPHALT PAVEMENT
<br />REMOVE CONCRETE PAVEMENT
<br />REMOVE GRAVEL SURFACE
<br />TEMPORARY SILT FENCE 0
<br />HIGH -VISIBILITY CONSTRUCTION FENCE x
<br />SCHEMATIC CLEARING LIMITS.
<br />CONTRACTOR TO FLAG CLEARING LIMITS
<br />AS REQUIRED
<br />SAWCUT EX PAVEMENT - - - - - - - - -
<br />PROPOSED BUILDING FOOTPRINT
<br />STORM DRAIN INLET PROTECTION
<br />CONSTRUCTION KEY NOTES
<br />(-A) CONSTRUCTION ACCESS
<br />D-9.0
<br />2 STORM DRAIN INLET PROTECTION
<br />�2O
<br />TEMPORARY SILT FENCE
<br />EX SEDIMENT POND AND RISER TO BE UTILIZED DURING
<br />CONSTRUCTION ACTIVITIES AND REMOVED UPON CONSTRUCTION
<br />OF PERMANENT STORM DRAINAGE FACILITIES
<br />UE REMOVE EX SIGN
<br />DEMOLISH EX CURB AND GUTTER
<br />DEMOLISH EX SIDEWALK
<br />ru"\ RELOCATE EX LIGHT POLE AND ELECTRICAL BOX, REFER TO
<br />SHEET C-3.0 FOR PROPOSED LOCATION
<br />ADJUST EX ELECTRICAL BOX TO FINISHED GRADE AS NEEDED
<br />PEDESTRIAN ACCESS NOTE
<br />PEDESTRIAN ACCESS ALONG INDUSTRY STREET SHALL REMAIN AVAILABLE DURING
<br />CONSTRUCTION TO THE MAXIMUM EXTENT TECHNICALLY FEASIBLE. INTERRUPTION
<br />OF PEDESTRIAN ACCESS SHALL REQUIRE THE CONTRACTOR TO OBTAIN SIDEWALK
<br />CLOSURE PLAN APPROVAL FROM THE CITY OF EVERETT
<br />L4 ; 7.11 IN Ll A I * m
<br />( IN FEET )
<br />1 inch = 30 ft.
<br />Know what's below.
<br />Cal I before you dii